File Note: W.r.t the observations raised by the Higher Authority, it is informed that the industry is engaged in manufacturing of T-shirts. The detailed manufacturing process of the industry is:  Raw material (yarn) –knitting - cutting –stitching –finishing pressing (with hot water diesel/ LPG based boiler both 50 kg capacity)-Packing. It is further informed that the hot water generator was inadvertently wrongly mentioned in the note  .  Actually, the industry has installed 1 no.  hot water diesel boiler and 1.No. hot water LPG based boiler both having 50kg capacity . The purpose of installing these boiler is generation of steam which can used for pressing the garment.  Submitted please.