| Id: | 25359279 |
| Approve: | false |
| Approve Note: | |
| Clarification: | false |
| Clarification Note: | Sir, With reference to your observation raised in CTO Air & Water, application, reply of the same as follow. 1. Please find enclosed site plan showing location of ETP & STP. 2. Please find enclosed latest analysis report of treated effluent issued by Punjab Pollution Control Board. We want to clarify that we have installed ETP & STP. The treated effluent from ETP is further treated in STP. 3. We have increased beds capacity from 30 to 45 beds for which we have applied varied consents of Air, Water & BMW Authorization along with required fee. Thanking you |
| Date Created: | 2024-04-05 17:38:32.425 |
| File Note: | Sir, With reference to your observation raised in CTO Air & Water, application, reply of the same as follow. 1. Please find enclosed site plan showing location of ETP & STP. 2. Please find enclosed latest analysis report of treated effluent issued by Punjab Pollution Control Board. We want to clarify that we have installed ETP & STP. The treated effluent from ETP is further treated in STP. 3. We have increased beds capacity from 30 to 45 beds for which we have applied varied consents of Air, Water & BMW Authorization along with required fee. Thanking you |
| Inspection: | false |
| Inspection Note: | |
| Officer: | H17FGS5522432 |
| Reject: | false |
| Reject Note: | |
| Role: | Industry |