Show ApplicationProcessingDetails

Id: 25477744
Approve: false
Approve Note:
Clarification: false
Clarification Note: Dear Sir, It is submitted that total wastewater generation will be 3.32 KLD out of which 3.26 KLD(98%) will be available after treatment for disposal and 0.15 KLD will be dispose off as a slurry in Sludge drying bed. after sun drying of slurry the sludge willbe used as manure in plants. Treated wastewater i.e., 2.26 KLD will be reused in Dual Plumbing and rest 0.9 KLD will be disposed onto decorative green plants across the complex [0.075 acre area considering (12.14m3/acre/day)] . There will be no DG Sets provided by the PP.
Date Created: 2024-04-22 17:35:36.0
File Note: Dear Sir, It is submitted that total wastewater generation will be 3.32 KLD out of which 3.26 KLD(98%) will be available after treatment for disposal and 0.15 KLD will be dispose off as a slurry in Sludge drying bed. after sun drying of slurry the sludge willbe used as manure in plants. Treated wastewater i.e., 2.26 KLD will be reused in Dual Plumbing and rest 0.9 KLD will be disposed onto decorative green plants across the complex [0.075 acre area considering (12.14m3/acre/day)] . There will be no DG Sets provided by the PP.
Inspection: false
Inspection Note:
Officer: G24BAR441311
Reject: false
Reject Note:
Role: Industry