| File Note: |
It is submitted that the reply of observations of the competent authority is as under:
1. The industry is a R-17 unit and the same is visited every 03 months to check the compliance status of environmental laws. The details of the monitoring carried out during last 01 year is as under:
a. The effluent samples were collected and the analysis results as obtained from Head office Lab, Patiala dated 24.11.2023 is tabulated as under:
Sr. no. Parameters Outlet of ETP From Aeration Tank Prescribed Standards
1. pH mg/l 6.8 - 7.0-8.5
2. TSS mg/l 38 - 50
4. COD mg/l 208 - 350
5. BOD mg/l 22 - -
6. Oil & Grease mg/l BDL - -
7. MLSS - 3680 -
8. MLVSS - 2570 -
From above, it is clear that the industry is complying with the prescribed standards.
Further, the stack emissions samples were collected and the analysis results as obtained from Head office Lab, Patiala dated 04.12.2023 is tabulated as under:
Point of Sample Collection Parameters Results (mg/Nm3)
Prescribed Standards
From port hole on stack after APCD (Boiler 30 TPH) Particulate Matter mg/Nm3 @ 12% of CO2
110 150
SO2 243 400
From above, it is clear that the industry is complying with the prescribed standards.
b. The effluent samples were collected and the analysis results as obtained from Head office Lab, Patiala dated 27.09.2023 is tabulated as under:
Sr. no. Parameters Outlet of ETP Prescribed Standards
1. pH mg/l 7.4 7.0-8.5
3. TSS mg/l 36 50
4. COD mg/l 188 350
5. BOD mg/l 21 30
7. Oil & Grease mg/l BDL -
From above, it is clear that the industry is complying with the prescribed standards.
Further, the stack emissions samples were collected and the analysis results as obtained from Head office Lab, Patiala dated 27.09.2023 is tabulated as under:
Point of Sample Collection Parameters Results (mg/Nm3)
Prescribed Standards
Port hole on stack boiler furnace (30 TPH) after APCD Particulate Matter 133 mg/Nm3 @ 12% of CO2 150 mg/Nm3 @ 12% of CO2
SO2 286 mg/m3 400 mg/ Nm3
From above, it is clear that the industry is complying with the prescribed standards.
c. The effluent samples were collected and the analysis results as obtained from Head office Lab, Patiala dated 21.06.2023 tabulated as under:
Sr. no. Parameters Outlet of ETP Aeration Tank Prescribed Standards
1. pH mg/l 7.9 - 7.0-8.5
2. TSS mg/l 41 - 50
3. TDS mg/l 997 - -
4. COD mg/l 164 - 350
5. BOD mg/l 22 - 30
6. Oil & Grease mg/l BDL -
7. MLSS - 3480 -
8. MLVSS - 2060 -
From above, it is clear that the industry is complying with the prescribed standards.
Further, the stack emissions samples were collected and the analysis results as obtained from Head office Lab, Patiala dated 21.06.2023 is tabulated as under:
Point of Sample Collection Parameters Results (mg/Nm3)
Prescribed Standards
A
Area upto 5 km from the periphery of class I and class II town B
Other than “A”
From port hole on stack after APCD (Boiler Furnance 30 TPH)
Particulate Matter (mg/Nm3 @ 12% of CO2)
90 150 150
SO2(mg/m3)
233 400
From above, it is clear that the industry is complying with the prescribed standards.
2. The industry has submitted a copy of application dated 29.09.2023 submitted by it to PWRDA. A copy of the same is attached herewith.
3. During visit it was observed that there was some wild grass growth in the plantation area. As the industry has around 5-6 acres of plantation area, the industry is required to clean the plantation area regularly so as to ensure no wild growth of grass occurs in the plantation area. Accordingly, a special condition (no.4) was also proposed in the agenda note.
4. The industry has not made expansion w.r.t. production capacity in its premises and the industry has applied for obtaining renewal of CTO for production capacity of 240 MTD. Thus, the site is suitable for renewal of CTO, please
Submitted please.
|