Show ApplicationProcessingDetails

Id: 25568954
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-05-02 16:58:54.794
File Note: It is intimated that the workshop is small scale and orange category unit and granted Consent to Operate under the Water (Prevention & Control of Pollution) Act, 1974 vide no. CTOW/Renewal/LDH4/2023/22359626 dated 14/08/2023 valid upto 13/02/2024 and under the Air (Prevention & Control of Pollution) Act, 1981, vide no. CTOA/Renewal/LDH4/2023/22359888 dated 14/08/2023 valid upto 13/02/2024 along-with temporarily restoration of electric supply for six months i.e. upto 13.02.2024 vide letter no. 4614 dated 14.08.2023. It is further intimated that the industry was given personal hearing before Chief Environmental Engineer, Ludhiana on 18.04.2024 wherein it was decided as under: 1. The industry shall apply, within 07 days, for consent to operate under the Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981. 2. Environmental Engineer, Regional Office-4, Ludhiana shall visit the industry to verify the contentions of the industry and submit the report along-with recommendations, within 15 days. 3. It was made clear to the industry to be careful in future and if the industry is found violating under the provisions of Water Act, 1974 and Air Act, 1981 in future, then strict action may be taken against the industry, without any further notice/opportunity of hearing. Now, the industry has applied for obtaining fresh CTO under the Water Act, 1974 and Air Act, 1981 along with requisite documents. The industry has deposited Rs. 16800/- vide dated 02.05.2024, out of which Rs. 8400/- as Air Consent fee and Rs. 8400/- as Water consent fee against the CA certificate of Rs. 136.98 Lacs, which is adequate up to 31.03.2025. The site was visited by the undersigned on 30.04.2024 and observed as under: - 1. The workshop is engaged in sale servicing and washing of four wheelers. 2. The workshop has installed ETP for the treatment of effluent generated from washing process. 3. The workshop has provided water meter with the outlet of ETP and reading of the same was 294.08 KL. The workshop has also provided energy meter with the ETP and reading of the same was 1632.04 KWH. 4. The workshop is maintained the record of water meter and energy meter, as per which the workshop has discharged 294.08 KL- 252.49 KL of y=treated effluent since last visit i.e is on 27.03.2024, thus, the effluent generation is about is 1.3 KLD. 5. Treated effluent is being utilized in adequate plantation area. 6. Hazardous waste room has been provided, around 70 Kg of sludge, some oil filter and waste oil was stored in it. 7. 01 D.G. set of capacity 35 KVA has been installed and same was equipped with canopy. 8. Effluent sample could not be collected due to non-availability of discharge. 9. The electric connection of the workshop was found intact. 10. The workshop has submitted letter issued by DTP, Ludhiana vide no. 525 DTP(L) M2A dated 11.03.2016, as per which, the site falls under the jurisdiction of MC Raikot and in residential zone. It is pertinent to mention here that the Master Plan of Raikot is yet to be approved. The DTP also informed that the building plan of the workshop has already been approved by the MC Raikot. As the industry is non-complying with the provision of Water Act, 1974, Air Act, 1981 and decisions of personal hearing. In view of the above, it is recommended as under : - 1. CTO under Water Act, 1974 and Air Act, 1981 may be granted for further six months subject to the usual conditions. 2. Direction u/s 33-A of Water Act, 1974 may be issued for temporarily restoration of electric connection for further six months.
Inspection: false
Inspection Note:
Officer: PPCB137
Reject: false
Reject Note:
Role: RO AEE Maninderjit Singh