| File Note: |
The proceedings of the review meeting dated 13.07.2023 are attached and as per the minutes in general instruction it is mentioned as under: -
"While processing the consents cases of project falling under Zirakpur area, 15.06.2022 is the cut of date for the project proponent to obtain permission of sewerage connection from MC Zirakpur. The consent cases may be processed accordingly."
Further, the project proponent has been issued a letter by MC Zirakpur vide letter no. 448 dated 17.04.2018, wherein, it has been mentioned as under:
‘ਸਰਕਾਰ ਵੱਲੋਂ ਨਿਰਧਾਰਤ ਸਾਰੇ ਚਾਰਜਿਜ ਨਗਰ ਕੌਸਲ, ਜੀਰਕਪੁਰ ਵਿਖੇ ਜਮ੍ਹਾਂ ਕਰਵਾਉਣ ਉਪਰੰਤ ਅਤੇ ਰੁਲਾਂ ਅਨੁਸਾਰ ਨਕਸਾ ਮੰਨਜੂਰੀ ਉਪਰੰਤ ਕੰਪਲੀਸ਼ਨ ਤੋਂ ਬਾਅਦ ਫਰਮ ਆਪਣੇ ਖਰਚੇ ਤੇ 143 ਕੇ.ਐਲ.ਡੀ ਫਰੀਟਡ ਸੀਵਰੇਜ ਨਗਰ ਕੌਸਲ, ਜੀਰਕਪੁਰ ਵਿਖੇ ਬਨਦੇ ਚਾਰਜਿਜ ਭਰਵਾਉਣ ਉਪਰੰਤ ਨਗਰ ਕੌਸਲ ਦੇ ਮੇਨ ਸੀਵਰ ਨਾਲ ਜੋੜਿਆ ਜਾ ਸਕਦਾ ਹੈ ਇਹ ਸਰਟੀਫਿਕੇਟ ਪ੍ਰਤੀ ਬੇਨਤੀ ਅਨੁਸਾਰ ਜਾਰੀ ਕੀਤਾ ਜਾਂਦਾ ਹੈ।’
The PP has obtained permission from MC Zirakpur for discharge of treated sewage vide no. 448 dated 17.4.2018, which is well before the directions issued to MC Zirakpur by the Board on 15.6.2022. Also decided in the review meeting of this office on 13.7.2023, the permissions may be given to such projects, which are having permission from MC regarding connectivity of MC sewer before 15.6.22.
The project proponent had obtained Environment Clearance vide no. F. No. 21-109/2020-IA-II dated 23.02.2021 for expansion of Group Housing Project namely “Uptown Skylla” with built up area of 87336 sqm having 383 flats and 11 no. shops at Zirakpur, Tehsil Derabassi, District SAS Nagar, Punjab by M/s Artique Infratech.
As per EC during operational phase, total water requirement is expected to be 259 KLD. This includes fresh water requirement of 173 KLD, which will be met from ground water and later from public supply by local authority. Treated Wastewater generation is expected to be 207 KLD, from two onsite Sewage Treatment Plants (STPs) having total capacity of 310 KLD.
About 117 KLD of treated wastewater will be reused. It is proposed to use 86 KLD for flushing and 31 KLD for gardening. Remaining treated waste water (about 90 KLD) will be disposed into municipal drain.
It is also clarified that at present there is no occupancy in the project.
In view of the above, it is recommended that the Consent to Operate under the provisions of the Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 may be granted upto 31.03.2027 with subject to the suitable conditions and additional conditions mentioned in earlier note.
Competency- Hon’ble Chairman of the Board
|