| Clarification Note: |
Sir, in reference to new observation raised, it is submitted that in application form installed casting capacity mentioned is 30 TPD i.e., maximum possible with 3 shifts. At initial stage industry will be started with single shift and ultimately up to 3 shifts as per market demand, not increase beyond 30 TPD and induction furnace will remain same i.e., of capacity 0.75 TPH. |
| File Note: |
Sir, in reference to new observation raised, it is submitted that in application form installed casting capacity mentioned is 30 TPD i.e., maximum possible with 3 shifts. At initial stage industry will be started with single shift and ultimately up to 3 shifts as per market demand, not increase beyond 30 TPD and induction furnace will remain same i.e., of capacity 0.75 TPH. |