| File Note: |
It is submitted that earlier, the project (PP) was obtained consent to operate under the Water (Prevention & Control of Pollution) Act, 1974 vide No. CTOW/Fresh/PBIP/ LDH/2023/ 2304637321 dated 09.05.2023 valid upto 31.03.2024 and the Air (Prevention & Control of Pollution) Act, 1981 vide No. CTOA/Fresh/PBIP/LDH/2023/2304804784 dated 09.05.2023 valid upto 31.03.2024 for storage facility for wheat @ 50,000 MTD.
Thereafter, PP applied for renewal of consent to operate under the Water (Prevention & Control of Pollution) Act, 1974 and the Air (Prevention & Control of Pollution) Act, 1981 along with required documents & fee which were refused vide No. CTOW/Renew/LDH2/2024/25088165 Dated 16.04.2024 and No. CTOA/Renew/LDH2/2024/25207825 dated 16.04.2024 respectively with the following reasons :-
(a) It has not provided sampling arrangements with its stack of APCD.
(b) It has provided septic tank to treat the domestic effluent which is further connected with soakage pit. Hence, the treated domestic effluent is discharged into soakage pit.
Now, the PP has applied for consent to operate under the Water (Prevention & Control of Pollution) Act, 1974 and Air (prevention & Control of Pollution) Act, alongwith documents & fee.
The site of project was visited by the undersigned (AEE) of this office on 08.05.2024 and Sh. Ashwinder Singh, AEE alongwith Scientific Staff on 09.05.2024 and contacted with Sh. M Manivannan, Terminal Manager of the Project. During visit it was observed as under: -
1. The project was in operation and loading of silos were being carried out during visit.
2. The flow chart of the process involves Receiving of food Grains Unloading & Debagging Curing/Drying of food grains Weight & testing Cleaning of food grains store and preserve Dispatch/Deliver as and when required by FCI.
3. It has installed of 6 silos of total capacity 50,000 MT as under :-
2 Nos. (17 mts height) of capacity 7110 MT each
2 Nos. (19 mts height) of capacity 8580 MT each
2 Nos. (20 mts height) of capacity 9310 MT each
4. It has also installed pre-storage silo of capacity 500 MT capacity.
5. It has installed 1 No. Bulk loader of capacity 60 MT and 2 Nos. Bagging fillow of capacity 30 MT each.
6. It has installed 6 Truck in-taker with 6 suction hoods which equipped with Bag filters as APCD to control the dust emissions during unloading of grains.
7. Now, it has provided the sampling arrangements with its stack of APCD. The stack emission sample from the stack of APCD was collected on 09.05.2024 and as per analysis report the concentration of Particulate matter was found 52 mg/Nm3, which is within the prescribed limits fixed by the Board.
8. It has installed 2 D.G. Sets of capacity 40 KVA and 380 KVA with canopy and now with adequate stack heights.
9. There is no source of trade effluent.
10. Now, domestic effluent is discharged onto land for plantation through septic tank. Soakage pit has been dismantled and plugged permanently.
11. It has developed approx. 5000 sq.ft. plantation area to discharge the treated domestic effluent.
12. As per previous consent granted to the project, the capital Invest of the project was 3595 Lacs. Now, the project cost is Rs. 4380 Lacs i.e. 785 Lacs increased. Hence, PP was required to deposit Rs. 10,800/- as NOC regularization fee + Rs. 500/- as consent form fee, which has not been deposited by the PP.
13. The project proponent has deposited the fee as under: -
(A) Under Water Act, 1974
Rs. 1,44,000/- vide R.No. 80585011 dated 20.02.2024
Rs. 24,000/- vide R.No. 28562026 dated 30.04.2024
----------------------------
Rs. 1,68,000/- Total
--------------------------
(B) Under Air Act, 1981
Rs. 1,44,000/- vide R.No. 949326825 dated 15.03.2024
Rs. 24,000/- vide R.No. 9943655 dated 30.04.2024
----------------------------
Rs. 1,68,000/- Total
--------------------------
14. The consent fee deposited by the PP is adequate upto 31.01.2028 (after deducting the NOC regularization fee of Rs. 10,800/- and Rs. 500/- as consent form fee)
15. The PP is now complying with the provisions under Water (prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981.
In view of above, it is recommended that consent to operate under the Water (Prevention & Control of Pollution) Act, 1974 may be Granted to the project proponent upto 31.12.2027. with usual conditions.
Cost of Plant and Machinery: Rs. 24.07 Crore.
Green Category.
Competency: -
As per MSME Notification Dated 01.06.2020
Medium Scale
Competency: SEE(ZO)
As per Boards practice:
Large Scale
Competency: CEE(L)
|