| File Note: |
It is submitted that the subject cited industry is a small scale red category unit and applied for obtaining ‘consent to establish'/ (NOC) under the Water Act, 1974 and Air Act, 1981 with requisite documents. The industry has deposited NOC fee against the project cost of Rs. 24.08 Lacs as per project report attached, which is adequate for one year as per Board's Office Order dated 29/10/2018.
The industry was visited by the undersigned on 15.05.2024 and it was observed as under:
1. The industry was in operation.
2. The industry is engaged in manufacturing of Auto Parts and Steel Fastners @ 2.3 MTD by using raw material as MS Plate 2.5 @ MTD, SS Plate 0.2 @ MTD, HCL Acid @ 25 Ltr/Day, Nitric Acid @ 1.0 Ltr/Day, M&R, Brightner & Passivation Dip @ 30 Ltr/Day and Zinc Metal Silly @ 8.0 Kgs/Day.
3. The manufacturing process of the industry is Raw Material – Blank Cutting / Piercing on Press - Welding – Zinc Electroplating – Packing.
4. The industry has made agreement with M/S JBR Tech. Focal point, Ludhiana (CETP) for disposal of its trade effluent @ 4000 ltr/month.
5. The industry has installed water meter on pipeline leading to process area whose reading during visit was 16.83 KL.
6. The industry is maintaining record w.r.t. fresh water consumption for the wet process & effluent lifted to M/s JBR Tech. Pvt Ltd. The record is reproduced below:
Water Consumed in Process / Effluent Generated (as per record maintained by the industry) Effluent lifted by CETP Operator (During Verification Period) Storage Cap. Qty. lying stored at the time of visit Last Lifting (Qty. & Date) Avg. frequency of lifting MOU signed for qty.
Initial WMR as on 01.02.2024: 0.0 KL
Final WMR as on 14.05.2024: 16.83 KL
Water consumed: 16.83 KL 12 KL 10000 ltr. 4000 ltr 4000 ltr. on 10.05.2024 30 days 4000 ltr.
As per the record the quantity of water consumed for wet process is in consonance with the quantity of effluent lifted to JBR Tech. Pvt. Ltd.
7. Domestic effluent generated by the industry is discharged into sewer.
8. The industry has installed 1 no. DG set of capacity 60 KVA, equipped with canopy and adequate stack height
9. The industry has submitted building plan prepared by Sh. Sukhjinder Singh approved Architect from Director of Factories, Punjab.
10. The site of industry is falls under the industrial focal point as per Master Plan, Ludhiana.
In the subject cited case, the industry has mentioned ground water extraction @ 1.7 KLD. Considering 25 working days per month, ground water extraction will be 42.5 KL/month, which is less than 300 KL/month.
It is therefore recommended that ‘consent to establish'/ (NOC) under the Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 may be granted for one year with suitable conditions as per policy of the Board.
|