File Note: Sir, it is submitted that in compliance of decisions of personal hearing dated 04.09.2023 regarding sealing of excess machinery than DEMAT of shares, industry was visited on 18.11.2023 and it was observed that the industry has got DEMAT all 339 shares and same were adequate to manage the quantum of discharge from installed machinery therefore no machinery is required to be sealed. The compliance status/report was sent to the Competent Authority through e-mail dated 28.11.2023. As the compliance in this regard had already been sent, it is recommended that varied consent to operate under Air (Prevention & Control of Pollution) Act, 1981 may be granted to the industry for the period of one year dyeing of yarn and fiber @ 3650 Kgs/day with trade effluent generation @ 338.0 KLD & domestic effluent @ 1.0 KLD into conveyance system of CETP 50 MLD subject to the condition that:- • The industry shall make the necessary arrangements to achieve the effluent standards as per the inlet designed parameters of the CETP. • The industry shall stop discharging its effluent in case due to any reason the CETP is not operational or dedicated conveyance system is overflowing. • The industry shall maintain the record of flow meter installed at outlet leading to CETP. • The industry shall not generate/discharge trade & domestic effluent more than 339 KLD without obtaining prior permission of the Board.
Inspection: false
Inspection Note:
Officer: PPCB150
Reject: false
Reject Note:
Role: RO AEE Bhisham