Show ApplicationProcessingDetails

Id: 25774836
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-05-27 16:58:29.132
File Note: It is intimated that the industry is a small scale red category dyeing unit and was granted consent to operate under Water Act, 1974 vide no. CTOW/Varied/LDH3/2022/19658870 dated 28.09.2022 and Air Act, 1981 vide no. CTOA/Varied/LDH3/2022/19658872 dated 28.09.2022 for the production of Printed Polyester Knitted Cloth @ 4 Tonne/day and dyed Polyester Cloth @ 1.8 Tonne/day with the disposal of Trade Effluent @ 45 KLD (out of which 15 KLD to be reused back into process mainly in printing section and balance 30 KLD will be discharged onto land for plantation) and domestic effluent @ 0.7 KLD onto land for plantation after passing through septic tank, which are adequate upto 30.06.2026. Now, the industry has applied for NOC for expansion in the existing premises under the provisions of the Water (Prevention & Control of Pollution) Act, 1974 and Air(Prevention & Control of Pollution) Act, 1981 for production of Printed Polyester Knitted Cloth @ 4 T/day and dyed Polyester Cloth @ 1.8 (Existing) + 4.5 (Proposed) = 6.3 T/day with discharge of trade effluent @ 111 KLD (5 KLD reused in printing section and 111 KLD onto land for plantation after ETP in an area of 1.75 AC) and domestic effluent @ 0.7 KLD onto land for plantation after treatment through septic tank. The industry has deposited Rs. 2200/- vide R no. 486638441 dated 23.04.2024 as NOC fee, which is adequate for the period of one year. The industry has submitted copy of CLU from STP, Ludhiana vide no. 3841/STP(L)/TW12A dated 24.12.2013 mentioning that the site of the industry falls in Industrial Zone as per Master Plan Ludhiana. The industry has proposed to install 05 more soft flow machines of capacity (300 KG X 1), (200 KG X 1) and (100 KG X 3) inside the premises alongwith existing machinery. The industry has submitted feasibility report of ETP of capacity 140 KLD, the industry has proposed to add biological tank as well as primary tube settler alongwith the existing ETP to treat proposed discharge after expansion. The industry has also proposed to add new plantation area and has submitted the registries and lease deed of entire land including planation area. The industry has attached the calculation of proposed discharge from the proposed machinery in the brief project report. The industry was visited by officer of this office on 24.05.2024 and observed as under: 1. The industry was in operation and the same was engaged in the process of printing and dyeing of fabric. 2. The industry has one rotary screen printing machine in the printing section and 03 soft flow machines of capacity 200 kg each for the dyeing of fabric in dyeing section. 3. The industry has installed ETP based on physic chemical treatment for the treatment of effluent generated from the process. During visit all components of ETP were in operation. 4. The treated effluent is being discharged onto land for plantation and a part of the treated effluent is being reused for the washing of printing screens. 5. The industry has provided total plantation area of about 5000 sqr yard, development of new plantation area was under process, hence after the completion of plantation work, total plantation area with the industry shall remain about 7000 sq yard( 1.5 acres), which will be adequate to manage the quantum of proposed discharge i.e 111 KLD considering discharge handling capacity of 70 KLD/ acre. 6. The industry has installed one thermo-pack of capacity @ 1500000 kcal/hour and one boiler of capacity 1.5 T/day with separate multi cyclone separators as APCD. The industry has provided common stack of adequate height with the boiler and thermopac. During visit stack was almost clear as no black smoke/ emissions observed from the stack. 7. The industry has also installed one DG set of capacity 160 KVA equipped with canopy and adequate stack height. In view of above, it is recommended that NOC for expansion may be granted to the industry for production of Printed Polyester Knitted Cloth @ 4 T/day and dyed Polyester Cloth @ 1.8 (Existing) + 4.5 (Proposed) = 6.3 T/day with discharge of trade effluent @ 111 KLD (5 KLD reused in printing section and 111 KLD onto land for plantation after ETP in an area of 1.75 AC) and domestic effluent @ 0.7 KLD onto land for plantation after treatment through septic tank for the period of one year with suitable conditions and special condition that the industry shall not commission the proposed machinery without getting varied consent to operate from the Board.
Inspection: false
Inspection Note:
Officer: PPCB150
Reject: false
Reject Note:
Role: RO AEE Bhisham