Show ApplicationProcessingDetails

Id: 25916167
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-06-13 17:52:48.907
File Note: The industry was visited alongwith scientific staff on 07.06.2024 and air emission samples were collected from porthole stack after APCD installed with boiler of capacity 04 TPH and as per analysis report, concentration of SPM is 526 mg/Nm3 i.e. beyond the prescribed limit (500 mg/Nm3). Submitted for uploading the proceedings of the hearing.
Inspection: false
Inspection Note:
Officer: PPCB148
Reject: false
Reject Note:
Role: RO AEE Rajpal Gill