Id: 25933856
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-06-16 14:30:06.645
File Note: The industry was visited on 3.06.2024 and it was observed as under: 1. The Industry was not in operation during the visit. 2. The Industry has installed separate cyclones as APCD with the shelling section and with the paddy cleaner of the dryer section with adequate sampling arrangement. 3. The Industry has started work to provide pucca road within the premises for the movement of vehicles during visit bricks have been brought at site and compaction was going on. 4. The Industry has provided fresh plantation within the premises. 5. The Industry has provided a windscreen (Jali) over the 10 feet boundary wall in the husk storage area however the same got damaged due to storm during visit work to reinstall the jali was going on. 6. The Industry has provided septic tank for treatment of the domestic effluent with disposal of the effluent onto plantation. 7. The industry has installed husk fired boiler @ 6 TPH with cyclone and adequate stack. 8. The industry has installed 8 no. cooking vessels/ handis. 9. Last season the industry has only commissioned/ operated for dry rice/ sorted rice and has not yet commissioned boiler section and installation of ETP is yet to be done. During visit the excavation work for ETP was complete and the civil work has started at site. The industry has submitted undertaking that the works will be carried out regarding road stabilization and installation of wind screen within 15 days and has requested to provide permission for steamed rice as the ETP is yet to be installed. The industry has installed all the machinery required for commissioning of the steam plant/ dry rice/ sorted rice unit. There are no houses near to the industry and teh site has agricultural fields surrounding all sides. The industry has already covered the stored husk with the HPDE sheets and restarted work for installation of jalli which was damaged due to storms.. If approved, Consent to operate under the provisions of Water Act, 1974 and the Air Act, 1981 may be issued to the industry with validity upto 31.3.2028 for the manufacturing of Steam rice @ 2TPH Raw Rice @ 3 TPH OR Raw Rice/ Sorted Rice @5 TPH with dryer with conditions that: 1. The industry will not manufacture Saila Rice without prior permission from the Board. 2. The Industry will stabilize the movement area within 15 days 3. The industry will reinstall the wind screen in the husk storage area within 15 days
Inspection: false
Inspection Note:
Officer: PPCB136
Reject: false
Reject Note:
Role: RO AEE Ravideep Singla