| File Note: |
As recommended by the team of officers (visit report attached above) and AEE, it is recommended that NOC for extension under the Water Act, 1974 and the Air Act, 1981 to the Educational Institute having area of 249.13 acres and total Built up area of 445678.09 sq.m & discharge of 926 KLD (out of which 571 KLD shall be discharge onto land for plantation and 355 KLD for recycling purpose) may be granted for one year subject to suitable conditions and following special conditions that: 1. The educational institute shall upgrade its existing STP installation of as per the timelines in the PERT chart submitted by it i.e. by 25.07.2024 and ensure that there is no odour nuisance in the residential area due to the operation of the STP. 2. The educational institute shall install odour measuring sensors near the boundary wall towards residential area within one month. 3. The educational institute shall make arrangement to cover the raw sewerage collection cum equalization tank in order to mitigate problem of odour from the said components. 4. The educational institute shall install sludge removal mechanism from the various components of STP within one month. 5. The educational institute shall ensure that all the residential as well as educational building within the premises of institute shall install water saving devices within one month. 6. The educational institute shall keep its discharge within the consented limits by adjusting the flow rate at the inlet of the STP and make equalization tank of adequate storage capacity (to accommodate additional effluent during rainy season also). 7. The educational institute shall obtain revised permission from PWRDA for ground water abstraction as per its discharge ratio. 8. The educational institute shall utilize the treated waste water for sprinkling on roads and katcha area within the institute on continues basis for suppression of dust. 9. The educational institute shall make its CAAQMS operational within one week and connect the same with the Board server. 10. The educational institute shall provide green belt along the complete boundary towards the residential area adjoining to it. 11. The educational institute shall install and commission mechanical composter of 3 TPD as proposed by it within one month and ensure that no solid waste is being dispose of outside premises of the institute. 12. The educational institute shall comply with all the conditions of Environmental Clearance granted to it by the Competent Authority within the specified time period and shall submit complete compliance while submitting the next six monthly report to the Board. 13. The education institute shall not exceed the built up area as mentioned in the EC granted to it and shall be liable to obtain revised EC for additional built up area and discharged beyond the consented limits.
|