Show ApplicationProcessingDetails

Id: 25952219
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-06-18 16:46:41.528
File Note: It is submitted that in light of the note of AEE above and as per recommendations given by the team of officers constituted by the Chairman of the Board in the hearing dated 15.05.2024 (visit report attached above), it is recommended that varied consent to operate under the Water Act, 1974 and the Air Act, 1981 may be granted to the institute having total Built up area of 3,91,136.1 sqm (96.65 acre) for discharge of domestic effluent @ 694 KLD, onto land for plantation and 132 KLD for recycling purpose for six months subject to suitable conditions and following special conditions that: 1. The educational institute shall upgrade its existing STP installation of as per the timelines in the PERT chart submitted by it i.e. by 25.07.2024 and ensure that there is no odour nuisance in the residential area due to the operation of the STP. 2. The educational institute shall install odour measuring sensors near the boundary wall towards residential area within one month. 3. The educational institute shall make arrangement to cover the raw sewerage collection cum equalization tank in order to mitigate problem of odour from the said components. 4. The educational institute shall install sludge removal mechanism from the various components of STP within one month. 5. The educational institute shall ensure that all the residential as well as educational building within the premises of institute shall install water saving devices within one month. 6. The educational institute shall keep its discharge within the consented limits by adjusting the flow rate at the inlet of the STP and make equalization tank of adequate storage capacity (to accommodate additional effluent during rainy season also). 7. The educational institute shall obtain revised permission from PWRDA for ground water abstraction as per its discharge ratio. 8. The educational institute shall utilize the treated waste water for sprinkling on roads and katcha area within the institute on continues basis for suppression of dust. 9. The educational institute shall make its CAAQMS operational within one week and connect the same with the Board server. 10. The educational institute shall provide green belt along the complete boundary towards the residential area adjoining to it. 11. The educational institute shall install and commission mechanical composter of 3 TPD as proposed by it within one month and ensure that no solid waste is being dispose of outside premises of the institute. 12. The educational institute shall comply with all the conditions of Environmental Clearance granted to it by the Competent Authority within the specified time period and shall submit complete compliance while submitting the next six monthly report to the Board. 13. 13. The education institute shall not exceed the built up area as mentioned in the EC granted to it and shall be liable to obtain revised EC for additional built up area and discharged beyond the consented limits.
Inspection: false
Inspection Note:
Officer: PPCB081
Reject: false
Reject Note:
Role: RO EE Vicky Bansal