Show ApplicationProcessingDetails

Id: 25959097
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-06-19 12:53:13.085
File Note: Sir, the industry was granted consent to operate under the Water Act, 1974 vide no. CTOW/Renewal/LDH1/2020/12963639 dated 13/07/2020 and under the Air (Prevention & Control of Pollution) Act, 1981 vide no. CTOA/Renewal/LDH1/2020/12961677 dated 15/07/2020 both valid upto 30/06/2025 for the manufacturing of Rim @ 200 Nos/day & Fork @ 40 nos/day. Further, the industry has obtained ‘consent to establish'/ (NOC expansion) valid upto 05/05/2025 for the manufacturing of Rim Assembly @ 500 Nos/day, Fork @ 250 No.s/day, Fork Hanger @ 3000 No.s/day and Bicycle Handle @ 3000 No.s/day. Now, the industry has applied for obtaining varied consent to operate under the Water Act, 1974 and Air Act, 1981 with requisite documents. The industry has deposited consent fee adequate upto 30/06/2028. The industry was visited by RO on 06.06.2024 and it was reported as under: 1. The industry was in operation during visit & engaged in manufacturing of rim & fork. It is engaged in the phosphating process. 2. The industry has made an agreement with CETP operator Ludhiana for lifting its trade effluent generated from phosphating @ 20000 Ltr/month and domestic effluent is discharged into sewer. 3. The domestic effluent @ 6 KLD of the industry is being discharged into sewer. 4. The industry has lastly lifted its trade effluent @ 10000 ltr vide no. 505313 dated 13.03.2024. 5. The industry has installed water meter on the pipeline for conveyance of fresh water to be used in wet process, reading of which was 1893.72 KL. The industry is maintaining record w.r.t. fresh water consumption for the wet process & effluent lifted to M/s JBR Tech. Pvt Ltd. The record of last 6 months is attached herewith. As per the record the quantity of water consumed for wet process is in consonance with the quantity of effluent lifted to JBR Tech. Pvt. Ltd. 6. The industry has installed one powder coating booth within built dust collector with electricity run baking oven. 7. The industry has installed two DG sets of capacity 200 KVA & 150 KVA with canopy and adequate stack heights. 8. The industry has already submitted the building plan approved from competent person under Director of Factories, Punjab which is in record file. 9. The industry is complying with the provisions of previous consents grant to it under Water Act, 1974 & Air Act, 1981. In view of the above, it is recommended that 'consent to operate' under the Water (Prevention & Control of Pollution) Act, 1974 may be granted upto 30/06/2028 with suitable conditions as per policy of the Board, please. (Category - Red, Small) (Competency - SEE)
Inspection: false
Inspection Note:
Officer: PPCB056
Reject: false
Reject Note:
Role: ZO EE Pardeep Balu