| File Note: |
1. The industry is installing 01 blow molding machine and details of the same has been given by the industry int he manufacturing process.
2. The school is laying permanently closed and same was found locked from outside and no responsible person was available at site. As per the local inquiry carried out at site and as per the condition of the school, it has been permanently closed. Further, no status has been submitted in writing regarding its operation.
3. The industry has proposed the manufacturing of Packaged / drinking /
Mineral water from raw water through RO system and neither any chemical will be used nor any industrial trade effluent will be generated. As such, the proposal of discharge of RO reject seems adequate.
Submitted with same recommendations as given on note dated 21.06.2024, please. |