| Id: | 26026631 |
| Approve: | false |
| Approve Note: | |
| Clarification: | false |
| Clarification Note: | We have proposed to install the batch mixed plant for the extended capacity and APCD is the part of the machinery. There is no requirement of additional APCD to be installed for the plant. The quantity of raw material and product are mentioned correctly in the application form for CTO under Water act and due to clerical error, the quantity was mentioned in MTD instead of TPH in the application form for CTO under Air Act. Actual Quantity of the plant is Premix material (batch Type) is 200 TPH; Premix material (Batch Type) 2 is 120 TPH; Wetmix Macadam Material is 200 TPH and Ready mix concrete material is 100 TPH. |
| Date Created: | 2024-06-26 10:13:34.201 |
| File Note: | We have proposed to install the batch mixed plant for the extended capacity and APCD is the part of the machinery. There is no requirement of additional APCD to be installed for the plant. The quantity of raw material and product are mentioned correctly in the application form for CTO under Water act and due to clerical error, the quantity was mentioned in MTD instead of TPH in the application form for CTO under Air Act. Actual Quantity of the plant is Premix material (batch Type) is 200 TPH; Premix material (Batch Type) 2 is 120 TPH; Wetmix Macadam Material is 200 TPH and Ready mix concrete material is 100 TPH. |
| Inspection: | false |
| Inspection Note: | |
| Officer: | O23BTI415259 |
| Reject: | false |
| Reject Note: | |
| Role: | Industry |