
| Id: | 26169708 |
| Approve: | false |
| Approve Note: | |
| Clarification: | false |
| Clarification Note: | Sir, the present data of raw material and products given in the application form is including with the existing raw material and production quantity. In this way, the total capacity of the rice sheller will be rice @ 3.0 TPH or paddy @ 4.5 TPH after expansion. Also, the industry is proposing to increase its capacity within its existing building and the land is being added for storage purposes only. The feasibility report is attached below. |
| Date Created: | 2024-07-08 13:04:39.498 |
| File Note: | Sir, the present data of raw material and products given in the application form is including with the existing raw material and production quantity. In this way, the total capacity of the rice sheller will be rice @ 3.0 TPH or paddy @ 4.5 TPH after expansion. Also, the industry is proposing to increase its capacity within its existing building and the land is being added for storage purposes only. The feasibility report is attached below. |
| Inspection: | false |
| Inspection Note: | |
| Officer: | O17BAR5624837 |
| Reject: | false |
| Reject Note: | |
| Role: | Industry |