Show ApplicationProcessingDetails

Id: 26189679
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-07-09 16:36:59.078
File Note: Earlier the industry was granted consent to establish (NOC for expansion) under Water (Prevention & Control of Pollution) Act, 1974 & Air (Prevention & Control of Pollution) Act, 1981 vide no. CTE/Exp/LDH1/2024/26010183 Date of issue: 05/07/2024 Date of expiry: 30/06/2025 for setting up of 2 nos. reactors of 7.5 Ton/batch, as the industry is having existing reactors of capacity 7.5 Ton/batch for production of Fuel Oil @ 12 TPD (6 TPD existing + 6 TPD proposed) & by product i.e. Carbon @ 11.34TPD (2200 kg existing + 9140 kg proposed). Now the industry was applied obtaining 'Consent to Operator' under Air (Prevention & control of Pollution) Act, 1981 and Water (Prevention & Control of Pollution) Act, 1974 for production of Fuel Oil @ 12 TPD & by product i.e. Carbon @ 11.34 TPD. The industry was visited by officers of this office on 08.07.2024 & observed as under: 1. The industry was not in operation during visit. 2. The industry has earlier installed 02 rotary furnaces of capacity 7.5 TPD each with common wet scrubber along with adequate stack height as APCD. Now, the industry has installed of 02 rotary furnaces of capacity 7.5 TPD each, for which NOC for expansion was granted by the Board vide dated 05.07.2024. 3. The industry has installed wet scrubber as APCD separately with the old furnaces as well as with the newly installed furnaces of capacity 7.5 TPD along with stack of adequate height and proper sampling arrangements. 4. The industry has provided the separate stacks of height around 100' with lighter arrangement to burn the excess flue gases and partial reused in the burner of the rector. 5. The industry has got conducted the health checkup of its worker. 6. The industry has submitted that it purchase the tyre scrap only within Punjab. 7. The industry is complying with code of practices and SOPs for such type of units. 8. As per master plan, Ludhiana site falls in designated Industrial Zone. 9. The industry has installed 02 D.G. sets of capacity 63 KVA & 32 KVA with canopies & adequate stack height. 10. The industry is complying with the provisions of the Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981. In view of above, it is recommended that 'Consent to Operate' under Air (Prevention & control of Pollution) Act, 1981 and Water (Prevention & Control of Pollution) Act, 1974 for manufacturing of Fuel Oil @ 12 TPD & by product i.e. Carbon @ 11.34 TPD may be granted to the industry upto 30.06.2029 with suitable terms and conditions, as per policy of the Board
Inspection: false
Inspection Note:
Officer: PPCB092
Reject: false
Reject Note:
Role: RO AEE Deepak Chadha