Clarification Note: Reply of observations: 1. The industry has not submitted the dimensional drawing of APCD. Reply: We have installed APCD at process emission and drawing of APCD is enclosed. 2. The fixed assets of the industry have been increased from 619. Lac as on 31.01.20219 to Rs. 654.67 lacs i.e. Rs. 35.63 Lacs increased. Hence, the industry is required to deposit Rs. 3,600/- as NOC Regularisation fee. Reply: Fee Deposited. 3. The industry is required to deposit Rs. 2160/- as Late fee + Rs. 500/- as consent form fee. Reply: Deposited. 4. The industry has not submitted the list of increased machinery. Reply: Attached. 5. The industry has not submitted the compliance report of previous Consent conditions. Reply: Already attached.
Date Created: 2024-07-11 12:02:01.875
File Note: Reply of observations: 1. The industry has not submitted the dimensional drawing of APCD. Reply: We have installed APCD at process emission and drawing of APCD is enclosed. 2. The fixed assets of the industry have been increased from 619. Lac as on 31.01.20219 to Rs. 654.67 lacs i.e. Rs. 35.63 Lacs increased. Hence, the industry is required to deposit Rs. 3,600/- as NOC Regularisation fee. Reply: Fee Deposited. 3. The industry is required to deposit Rs. 2160/- as Late fee + Rs. 500/- as consent form fee. Reply: Deposited. 4. The industry has not submitted the list of increased machinery. Reply: Attached. 5. The industry has not submitted the compliance report of previous Consent conditions. Reply: Already attached.
Inspection: false
Inspection Note:
Officer: R14LDH2765367
Reject: false
Reject Note:
Role: Industry