| File Note: |
As discussed, the latest stack emission sample was collected by the officer of the Board 01.09.2023 from the porthole of the common stack attached to the APCD connected with the boiler of capacity 03 TPH and thermopack of capacity 1000 U. As per analysis results concentration of SPM is found to be 232 mg/Nm3 against 500 mg/Nm3 which is within the permissible limits.
As proposed by Regional Office, may, if approved that varied consent to operate under the Air (Prevention & Control of Pollution) Act, 1981 be granted upto 30.06.2029 with suitable conditions and with following special conditions:-
1. The industry shall not emit black smoke at any point of time, under any circumstance.
2. The industry shall make proper and adequate arrangements for storage & disposal of Boiler Ash.
3. The industry is prohibited from using any unauthorized fuel such as used tyres, solid waste, oil sludge, acid sludge or any other banned fuel material etc.
4. The consent to operate is only for the authorized fuel and subsequently for its Air Pollution Control Device is designed for as per the standards set by the MoEF&CC/CPCB/PPCB.
5. The industry shall not use and store any unauthorized/un-consented fuel at it site.
Competency: SEE |