Show ApplicationProcessingDetails

Id: 26324105
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-07-22 12:53:19.68
File Note: It is intimated that the industry was earlier granted consent to establish by the Board vide no. CTE/Fresh/BAR/2024/26003388 dated 08/07/2024 valid upto 07/07/2025 for manufacturing of Bituminous macadam @ 120 TPH by using Crushed stone aggregates of different sizes and Bitumen @ 120 TPH as raw material. Now, the project has applied for obtaining fresh consent to operate for same production i.e. manufacturing of Bituminous macadam @ 120 TPH by using Crushed stone aggregates of different sizes and Bitumen @ 120 TPH as raw material under the Water Act, 1974 and the Air Act, 1981. The project proponent has deposited consent fee of Rs. 14,500/- vide UTR. No. 103153649 dated 15.07.2024 under the Water Act, 1974 and Rs. 14,500/- vide UTR. No. 175056983 dated 15.07.2024 under the Air Act, 1981 against the projected cost of Rs. 40.12 Lacs, as per CA certificate dated 10.07.2024, which is adequate upto 30/09/2029. The project proponent has submitted approved building plan duly approved by Competent Person approved by Director of Factories, Punjab vide dated 15.07.2024. The project proponent has submitted completion certificate of water scrubber as APCD along with adequate stack with its hot mix plant and adequate stacks with bitumen tank. To verify the facts, the proposed site of the project was already visited by the officer of this office on 19.07.2024 and it was observed as under: - 1. The site is located at Fatehgarh Channa Raod, Village Handiaya, Tehsil and District Barnala outside MC limits. 2. The industry has installed the hot mix plant but was not operational during visit. The representative of industry informed that plant will be operated after obtaining CTO which is pre requisite for participating in tendering process. 3. The industry has installed all the machinery at site and ready to operate the same. 4. The industry has installed the water scrubber as APCD along with adequate stack with its hot mix plant and adequate stacks with bitumen tank. The recirculation tanks for scrubbing effluent are also provided. 5. The industry installed one D.G. of capacity 160 KVA with canopy and adequate stack height, inside the premises and also informed that there is no need of separate electric connection to run hot mix plant as it is being operated on D.G set. 6. The industry has provided the adequate green belt around the boundary area of the unit and the domestic effluent is being discharge on to land for plantation after passing through septic tanks. Thus, the industry is complying with the conditions as mentioned in the earlier granted NOC. In view of the above, it is recommended that consent to operate under the Water Act, 1974 and the Air Act, 1981 may both be granted to the industry upto 30/09/2029 (upto adequacy of fee) with usual conditions. Competency SEE
Inspection: false
Inspection Note:
Officer: PPCB151
Reject: false
Reject Note:
Role: RO AEE Sachin Singla