| Clarification Note: |
The application of the project has been scrutinized and it was observed that the total water requirement of the project is 35.3 KLD and generation of effluent is 28.24 KLD and has proposed to utilized 27.47 KLD for flushing purpose.
However, the maximum flushing water requirement of the project is about 15.7 KLD i.e considering flushing requirement @ 20 lpcd.
As such you are requested to resubmit the water balance for the project alongwith disposal arrangement for excess 12.50 KLD treated wastewater within 2 days.
|