| File Note: |
It is intimated that the industry was granted consent to establish under the provisions of Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 vide no. CTE/Fresh/SAS/2024/25356837 dated 26.04.2024, valid till 31.03.2025 for Ready Mix Concrete @ 45 m3/h with certain conditions.
Now, the industry has applied for obtaining fresh ‘consent to operate’ under the Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 for Ready Mix Concrete @ 45 m3/h, alongwith requisite documents.
The industry has deposited Rs. 32,000/- vide UTR No. N131243032715296 dated 10.05.2024 under Water Act, 1974 and Rs. 32,500/- vide UTR No. N131243032744798 dated 10.05.2024 under Air Act, 1981 against the fixed assets of Rs. 1.19 crore on 05.03.2024. The consent fee under both acts is adequate upto 31.03.2029.
Manufacturing process: -
Raw Material (Premix)—Batching—Mixing—Transporting— Placing—compacting—curing.
The project proponent has submitted distance certificate issued by SDM, SAS Nagar vide no. 483 dated 02.04.2024 as under:
• ਰਿਹਾਇਸ਼ੀ ਇਲਾਕੇ ਤੋ ਸਾਈਟ ਦੀ ਦੂਰੀ ਲਗਭਗ 760 ਮੀਟਰ ਹੈ।
• ਸਾਇਟ ਦੀ ਪਿੰਡ ਟੰਗੋਰੀ ਦੀ ਲਾਲ ਲਕੀਰ ਤੋਂ ਦੂਰੀ ਲਗਭਗ 760 ਹੈ।
• ਸਾਇਟ ਦੀ ਪਿੰਡ ਟੰਗੋਰੀ ਦੀ 15 ਪੱਕੇ ਘਰਾਂ ਤੋ ਦੂਰੀ ਲਗਭਗ 760 ਮੀਟਰ ਹੈ।
• ਸਾਇਟ ਦੀ ਪਿੰਡ ਟੰਗੋਰੀ ਦੀ ਫਿਰਨੀ ਤੋ ਦੂਰੀ ਲਗਭਗ 770 ਮੀਟਰ ਹੈ।
• ਸਾਇਟ ਦਾ ਰਕਬਾ ਐਮ ਸੀ ਬਨੂੜ ਵਾ ਮੋਹਾਲੀ ਦੀ ਹੋਂਦ ਤੋ ਬਾਹਰ ਹੈ।
The project proponent has submitted rent agreement made on 08.02.2024 between Smt. Amrik Kaur and M/s Dwell Infra.
The project proponent has submitted partnership deed made on 06.01.2024 between Mr. Mohit Gupta, Mr. Liladhur Gupta, Mrs. Payal Goyal and Mrs. Shivali.
The project proponent has submitted approved site plan issued by the Competent person under Factory Act, 1948.
The project proponent has submitted compliance report of the consent to establish under the provisions of Water Act, 1974 and Air Act, 1981 granted to it.
The industry was visited by AEE of this office on 26.03.2024 and during visit, it was observed as under:
1. The industry has installed machinery of ready mix concrete (RMC) unit at the site and the same was in operation.
2. The unit has installed 02 no. Silos for storage of cement and fly ash having dust collection system at the top of the silos.
3. The other raw materials i.e. sand, aggregates of different sizes etc. are being stored in open area at the unit.
4. There is use of water in the mixing of bajri, cement, sand etc. which is consumed 100% in the process.
5. There is generation of trade effluent from the process while preparation of the RMC, the same is being collected in collection tank for further re0use in the process. No effluent is being discharged from the process. The domestic waste water generated from the plant is being discharged onto land for plantation after treatment in septic tank.
6. The industry has installed one no. of DG set of capacity 125 KVA, which is equipped with canopy and adequate stack of height.
7. The industry has stabilized the road inside its premises for movement of vehicles with gatka. The representative of the industry was advised to keep the said road in good condition at all times.
Recommendations:
In view of above, it is recommended that the ‘consent to operate’ under the Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention &Control of Pollution) Act, 1981, may be granted to the industry upto 31.03.2029 with subject to suitable conditions and additional conditions that: -
1. The industry shall re-use the entire waste water generated from the process. The industry shall discharge only domestic effluent onto land for plantation within premises, after passing through septic tank.
2. The industry shall keep the movement area clean and in good conditions, at all times.
3. The industry shall provide mechanical water sprinklers all along the boundary walls of the unit, so as to mitigate the dust pollution, within 01 month.
4. The industry shall carry out more plantation along its boundary walls, within 01 month and shall intimate the compliance of the same to the Board.
5. The industry shall ensure that no problem related to dust pollution is being caused by the unit due to its operation and no public complaints are received by the Board in this regard.
6. The project proponent shall comply with the guidelines issued by PWRDA and shall obtain permission from PWRDA for abstraction of ground water.
7. The industry shall comply with the zoning guidelines of PUDA/GMADA/Department of Town & Country Planning, at all times.
8. The industry shall not discharge the effluent into any drain/choe/nallah, in any case.
9. The industry shall not discharge any effluent at any unauthorized place by any unauthorized means i.e. shall not discharge any wastewater in any drain / inland surface waters / drain/choe/nallah/ onto land for stagnation or outside its premises, at any time, under any circumstances.
10. The industry has been approved by the Board from pollution angle and the industry shall obtain the statutory clearances / permissions from all other concerned departments.
11. The adequacy/ efficacy of the pollution control arrangements shall be the sole responsibility of the industry and the industry shall be bound to implement/ upgrade its pollution control arrangements as per the discretion of the Board to achieve the prescribed emission/ effluent standards, as amended from time to time.
12. The industry shall ensure the compliance of provisions of the Water (Prevention & Control of Pollution) Act, 1974, Air (Prevention & Control of Pollution) Act, 1981, Environment (Protection) Act, 1986 and/or any other environmental law applicable to him and Rules, Circulars & Directions issued by the Board from time to time.
13. The ‘consent to operate’ is being issued to the project proponent based upon the documents/ information submitted by it along with the online application form. The Board would be at liberty to take penal action against the industry/project proponent and its responsible/ concerned person(s) in case information/document is detected as incorrect/false/misleading at any point of time, without any opportunity of Personal Hearing.
14. In case the project proponent fails to comply with the provisions of the Water (Prevention & Control of Pollution) Act, 1974, Air (Prevention & Control of Pollution) Act, 1981, Environment (Protection) Act, 1986 and/or any other environmental law applicable to the project and Rules, Circulars & Directions issued by the Board from time to time, action as deemed fit shall be taken against the project proponent.
*Competency- Environmental Engineer
|