Show ApplicationProcessingDetails

Id: 26439166
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-07-31 15:04:33.673
File Note: It is submitted that during process of previous application no. 26048242 for consent to operate under the Air (Prevention & Control of Pollution) Act, 1981, consent certificate was generated as per details mentioned in agenda note prepared by Regional Office. In the agenda note the following machinery is verified by visiting officer during visit in the unit. Particular Capacity (in TPH) Type of fuel Quantity of Fuel Units Stack Height (in mtrs.) AGL Details of APCD OIL FIRED FURNACES-4 NOS. 1150 HSD 0.2 Kilo Litres/Day 10 Not Required BABY BOILER 1150 HSD 0.2 Kilo Litres/Day 10 Not Required PAINT BOOTH/OVEN-3 NOS. 1150 HSD 0.6 Kilo Litres/Day 10 Water Sprinkling System DG 60 HSD 200 Metric Tonnes/Day 3.5 Yes (canopy) No LPG furnance verified by RO at site, baby boiler is verified by RO and HSD fuel is used in paint booth verified by RO and certificate is generated accordingly(copy of agenda note attached). The contents of agenda note are taken as per actual verification by Regional Office. Now, RO recommended to amend the generated certificate as per following machinery. 1. The industry has installed LPH (15Kg/day) based hot water generator in place of baby boiler but baby boiler was inadvertently mentioned in the certificate. 2. Fuel of paint booths are required to be corrected i.e. electricity in place of HSD. 3. Fuel of LDO base brazing franaces is 100 ltr/day. From above it seems that RO has not visited the industry to verified the above machinery and not attached fresh agenda with this application. If approved, RO may be requested to send the agenda note after verification of abovesaid machinery and explain why not verified the machinery mention in the previous agenda note.
Inspection: false
Inspection Note:
Officer: PPCB056
Reject: false
Reject Note:
Role: ZO EE Pardeep Balu