Show ApplicationProcessingDetails

Id: 26447763
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2024-08-01 13:10:41.828
File Note: Sir, it is submitted that the pointwise compliance of hearing decision dated 06.12.2023 is as under: 1. To improve the efficiency of bag house of the existing APCD, the industry shall up-grade its bag filters in the bag house in the existing APCD as per the specifications given below within one month and shall get it verified/ certified from PSCST, Chandigarh. 2. The industry shall submit the proposal regarding control of Secondary Emissions generated from the process within one month after consultation with the PSCST, Chandigarh. 3. The industry shall submit a bank guarantee amounting to Rs. 2.0 lakh within 7 days as an assurance to comply with the Environmental Laws and Environmental Engineer, Regional Office, Fatehgarh Sahib shall encash 50% of the above said bank guarantee. 4. The industry shall use good quality raw material free from dust and oil. 5. The industry shall develop the adequate green area all around the boundary wall and shall stabilize all of its movement area within the premises of the industry as well as approach around the industry, so as to minimize the dust emissions within one month. 6. A team of the officers shall be constituted by CEE(B) to surprisingly visit the industry to verify the conditions imposed in Environmental Clearance, other compliance of Environmental Laws immediately after one month and shall submit report/ recommendations, thereafter. 7. Environmental Engineer, Regional Office, Fatehgarh Sahib shall verify the compliance of the decisions of the hearing and submit the report/ recommendations after one month. In Compliance 1. The industry has installed induction furnace of capacity 10 TPH and the industry has upgraded its bag filter house as APCD as per drawing as design of PSCST Chandigarh. The PSCST Chandigarh has issued completion certificate vide no. PSCST/TFD/65 dated 07/06/2024. 2. The industry has submitted the pert chart of APCD to control the secondary emission during generated from the process. Pdf attached. 3. As per the decision of the Competent Authority, the bank guarantee no. 6552IPEBG240003 dated 14/02/2024, amounting to Rs. 1,00,000, was encashed by this office letter no. 3010 dated 29/02/2024 and for remaining amount the industry was submitted another the bank guarantee no. 6552IPEBG240002 dated 14/02/2024 valid upto 15/02/2025 amounting to Rs. 1,00,000 at Regional Office, Fatehgarh Sahib. 4. The industry was using good quality raw material free from dust and oil during the visit. 5. A green belt shall be developed over an area of 3,806.20 Sqm, which is equal to 33% of the plant area. However, the industry has presently devolved approximately approx. 1000 Sqm of green area. The industry has submitted an undertaking stating that the remaining area will be developed during this monsoon season. As per the record, there is no other industry except Durga Multimetals Pvt. Ltd whom Gram Panchayat Chattarpura has been allotted land on lease for developing mini forest. Submitted please  
Inspection: false
Inspection Note:
Officer: PPCB118
Reject: false
Reject Note:
Role: RO AEE Malkit Singh