| File Note: |
Kindly clarify the following:
1. At the time of NOC, the cost of project was 2.77 Cr. and now the cost is 1.71 Cr.
2. How have you ascertained that the capacity of paddy drier 32 Ton/batch.
3. Has the industry installed paddy pre-cleaner with the drier and what all points are connected with the cyclone before paddy milling and in the paddy milling line.
4. Status of sampling arrangement.
5. Has the industry install APCD as per the drawing / dimension given in the feasibility report submitted by it.
6. Kindly submit compliance of special condition no. 11 and 13 imposed in the NOC granted.
|