Show ApplicationProcessingDetails

Id: 30783388
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2025-12-30 12:57:19.011
File Note: It is intimated that the unit is large scale green category unit and is established at A-5 Focal Point, Ludhiana. Earlier the industry has obtained Consent to Operate under Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 from the Board Date of expiry 08-12-2025 for manufacturing of TOOLS, JIGS & FIXTURES FOR R&D PURPOSES ONLY AND INSTITUTION HAS NO OWN PRODUCTION @ 0.09 Metric Tonnes/Day by using SPECIAL STEEL, IRON ALLOYS @ 0.1 Metric Tonnes/day. Now the industry has applied for renewal consent to operate under Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 ...............The adequacy of fee deposited is up to 08.12.2030. The industry was visited by the officer of this office on 18.12.2025 and observed that: 1. The industry was in operation during visit and engaged in research & development of tools, jigs & fixtures and do not have any production. The industry has installed five electric heat treatment furnaces (Tempering & hardening). 4. The industry has installed one DG sets of capacity 463 KVA with acoustic room and adequate stack height. 5. The industry has already submitted the building plans approved from competent person under Director of Factories, Punjab. Matter regarding water consent is being dealt in water application. In view of above it is recommended that the industry may be granted ‘Consent to Operate’ under Air (Prevention & Control of Pollution) Act, 1981 upto 31.12.2030 with suitable conditions please.(Comp. MS , LArge ,Green)
Inspection: false
Inspection Note:
Officer: PPCB126
Reject: false
Reject Note:
Role: ZO EE Sukhwant Singh