| File Note: |
The industry is a small scale forging unit situated in industrial zone. The industry has installed 03 no. Induction heaters, out of which two were in operation. It has installed 1 no. shot blasting machine with inbuilt bag house as APCD alongwith adequate stack height and 11 no. of Power presses of various capacity. No trade effluent is generated and domestic effluent is being discharged onto land for plantation after passing through septic tank.
Keeping in view of above, may if approved, Consent to operate under the Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 may be granted upto 30/09/2032 with suitable conditions as per policy of the Board. (Competency – Senior Environmental Engineer) Cost of plant & machinery = 24.15 Lacs
|