Show ApplicationProcessingDetails

Id: 30867366
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2026-01-08 15:52:04.537
File Note: On examining the application, it was observed as under: 1. The industry has not submitted feasibility/technical report regarding achieving of revised emission standards as per MOef&CC notification dated 16.05.2023, by the 08 TPH boiler and thermopac installed in its premises. 2. The industry has not submitted calculation of proposed water consumption and discharges vi ins-a-vis proposed productions, liquor ratio, no of lots, RFD etc. Moreover, industry has proposed multiple products like PC, cotton, polyester and yarn dyeing. Industry to justify production and corresponding waste water generation with machinery installed in its premises. ........ If approve noting be reverted to RO for clarification of above, please.
Inspection: false
Inspection Note:
Officer: PPCB149
Reject: false
Reject Note:
Role: ZO EE Anish Sharma