Show ApplicationProcessingDetails

Id: 30934257
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2026-01-16 17:46:34.041
File Note: Previous History: Category/ Scale Red/ Small Water Consent CTOW/Varied/FGS/2024/25884743 dated 24.06.2024 Air Consent CTOA/Varied/FGS/2024/25884742 dated 24.06.2024 Validity 31.12.2025 Raw Material Mild Steel Rod @ 200 Kg/day Products Thread take up lever @ 2500 Number/Day Now, applied for: Varied Category/ Scale Orange/ Small Raw Material Mild Steel Rod @ 200 Kg/day Products Thread take up lever @ 2500 Number/Day Reason for Varied Consent The industry has removed the pickling and casting tumbling process. Additionally, the industry has installed 01 no. electric annealing furnace to improve the quality of product; however, there is no increase in production capacity. Consent Fee Detail: Previous CA Certificate Rs. 80.00 lacs Previous Adequacy under both Acts 31.12.2025 New CA Certificate Rs. 83.00 lacs Plant & Machinery Rs. 69.00 lacs Fee under Water Act, 1974 Rs. 28,000/- vide online R. No. 931890905 dated 27.12.2025 Fee under Air Act, 1981 Rs. 28,700/- vide online R. No. 404078356 dated 27.12.2025 Adequacy under both Acts 31.12.2030 under the both Acts after adjusting Rs. 700/- as NOC regularization fee for increase in cost of fixed assets as per Board’s office order dated 29.10.2018. Visit: To verify the contents of the application, the industry was visited by the undersigned on 02.01.2026 and Sh. Satpaul Panesar, Proprietor was contacted. During visit, it was observed as under: 1. The industry was in operation. 2. The industry has installed 02 no. electric heating furnace of size 2 ft x 2 ft, 02 no. forging press, 03 no. framing press, 08 no. Drill machines, 04 no. Lathe machines and 02 no. electric annealing furnaces. 3. The industry has installed 1 no. DG set of capacity 160 KVA, which is equipped with canopy and stack of adequate height. 4. The industry has stopped its pickling process as verified during visit. 5. The industry has not provided any submersible pump as the source of fresh water is MC water supply. 6. No water is used in the process, so no trade effluent is generated 7. The industry has provided septic tank for the treatment of domestic wastewater and the same is being disposed off onto land for plantation after passing through septic tanks. Recommendations: In view of the facts mentioned above, if approved, it is recommended that the varied consent to operate under the provisions of the Water (Prevention & Control of Pollution) Act, 1974 and the Air (Prevention & Control of Pollution) Act, 1981 for manufacturing of Thread take up level @ 2500 nos./day may be granted upto 30.09.2030 subject to suitable conditions and following additional conditions that: 1. The applicant shall be liable to abide by the provisions of the Master Plan to be notified and shall also be bound to follow the provisions of the section 79 along with other provisions of the PRTPD Act, 1995. In case, the site falls in non-conforming land zone after the notification of Master Plan and no claim shall be demanded by the applicant from the Department. 2. The industry shall obtain NOC of the Board, if it changes any of its product or raw material or enhances its production capacity in future. 3. The industry will not carry out the pickling process without obtaining prior written permission of the Board. 4. The industry will not install any additional air polluting source without obtaining prior written permission of the Board. 5. The industry shall promote use of alternatives of single use plastics (SUP) and awareness to discourage use of plastic. 6. The industry shall ensure that there are no usages of single use plastic- thermocol disposable items such as water bottles / water pouches/water cups, plates, forks, spoons, straw etc. and single use decorating material made of plastic-thermocol or any other non-biodegradable material in the premises. 7. The industry shall ensure that there is no public nuisance/ odor problem in the area, due to activities of the industry. 8. The industry shall be bound to shift its unit from present location to designated area within the stipulated period as per the provisions of the notified Master Plan of Bassi Pathana, if need be. Competency - SEE
Inspection: false
Inspection Note:
Officer: PPCB185
Reject: false
Reject Note:
Role: RO JEE Vinod Singla