Show ApplicationProcessingDetails

Id: 30945714
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2026-01-19 12:32:37.686
File Note: It is submitted that the industry has submitted a written reply of the show cause notice. The calculation of proposed water consumption and discharges vi ins-a-vis proposed productions, liquor ratio, no of lots, RFD etc. is attached herewith. Further the stack emission sample was collected on 23.09.2025 and as per result the particulate matter was found to be 178 mg/NM3, which is within prescribed limit as per new fuel policy of the Board. Further the industry has submitted a undertaking they will upgrade the APCD as per the revised emission standards as per MoEF&CC notification dated 16.05.2023. In view of above, it is recommended as under: - 1. Electric supply of the industry may be restored for temporary period upto six months. 2. Fresh Consent to operate under the Water Act, 1974 may be granted to the industry upto six months with special conditions as under:- 1. The industry will upgrade its APCD as per rrevised emission standards as per MoEF&CC notification dated 16.05.2023. 2. This consent to operate is subjected to the decisions of Hon'ble National Green Tribunal in the appeal case no. 41 of 2024 filed by the CETP of 40 MLD. 3. The industry shall continue to comply with all the Board directions already issued to it under the relevant act. 4. The industry shall not generate/discharge trade & domestic effluent more than its allotted shares capacity. 5. The industry shall discharge the whole of its consented effluent into a dedicated sewer line leading to CETP for final treatment. 6. The industry shall not make any new connection/undisclosed connection for the discharge of effluent either into the public sewer or PDA conveyor system. 7. The industry should either take measures to control its inlet parameters by good practices and selection of good chemicals for processing or shall operate and maintain its existing effluent treatment plant (ETP), regularly and efficiently, so as to achieve the inlet effluent standards of CETP as per DPR. 8. The industry shall make the necessary arrangements to achieve the effluent standards as per the inlet-designed parameters of the CETP. 9. There shall be no any other physical expansion of the unit either with the installation of new machinery without valid permissions of the Board. 10. The industry shall stop discharging its effluent in case due to any reason the CETP is not operational or the dedicated conveyance system is overflowing. 11. The industry shall maintain the record of flow meter installed at source and at the outlet leading to CETP. 12. The industry shall carry out third-party audit from any reputed institute to access the actual discharge capacity of the dyeing unit in compliance with the proceedings issued by the Board vide letter no. 4387 dated 09.08.2023 to the CETP 40 MLD. 13. The industry shall obtain necessary permissions for the abstraction of ground water from PWRDA/CGWA. 14. The industry shall maintain the record of untreated effluent at the outlet in such manner that it shall not affect the working of CETP.
Inspection: false
Inspection Note:
Officer: PPCB232
Reject: false
Reject Note:
Role: RO AEE Ridham