| File Note: |
It is submitted that the project proponent has proposed to establish a Affordable colony (Residential Plotted) namely “Sun City” through Shre Suryacon Developers over an area of 6.606 acres, bearing Khasra Nos. 2//19/2, 20/3, 21, 22, 13//1, 2, 9, 10, 11, 12 situated at Ganganagar road, Area Village Alamgarh, Tehsil Abohar, Distt. Fazilka, comprising 143 plots (130 residential plots and 13 EWS plots)…………… The project proponent has applied for Consent to Establish (NOC) under the provisions of the Water (Prevention & Control of Pollution) Act, 1974 and the Air (Prevention & Control of Pollution) Act, 1981. The details of the case are as under: 1. The project proponent has submitted a project report indicating the total proposed project cost, including land, as 502.720 lakhs. Accordingly, it has deposited ₹10800/- vide UTR/Receipt No. 618569180 dated 02.01.2026 and ₹7200/- vide UTR/Receipt No. 274881942 dated 10.01.2026 towards NOC fee, which is adequate for a period of one year................. 2. The project proponent has submitted a copy of the Letter of Intent (LOI) bearing Memo No. 12/BB dated 07.07.2025 issued by the Competent Authority i.e. Commissioner, Municipal Corporation, Abohar, granting a license for setting up the colony “Sun City” bearing Khasra Nos. 2//19/2, 20/3, 21, 22, 13//1, 2, 9, 10, 11, 12 situated at Ganganagar road, Area Village Alamgarh, Tehsil Abohar, Distt. Fazilka. The proposal is as per the layout plan approved by the Competent Authority vide Application No. PB/LOUT/FKA/AВОНА/1003 dt. 27.03.2025.................... 3. The project proponent has submitted a copy of the layout plan approved by the Competent Authority i.e. Commissioner, Municipal Corporation, Abohar vide No. PB/LOUT/FKA/ABOHA/1003 dt. 27.03.2025 showing total area of 26734.51 sq. m covered by 143 plots (130 residential plots and 13 EWS plots). Total residential saleable area (Residential + EWS) is 16852.60 sq.m and total non-saleable area is 9859.15 sqm. Hence, considering the max FAR of 2.1, the total built-up area of the project is 35390.50 sq m. which is less than 1,50,000 sq. m, hence it is not covered under provisions of the EIA Notification dated 14.09.2006.............. 4. As per the revised feasibility report submitted by the PP (copy attached), the proponent has estimated water consumption and wastewater generation by assuming 15 persons per residential plot and 135 liters per person per day water use. Accordingly, about 225 KLD of wastewater will be generated and PP has proposed the installation of a STP of 280 KLD capacity based on MBBR technology, comprising Screen Chamber, Oil & Grease Chamber, Sewage Collection-cum-Equalization Tank, MBBR Reactors I & II and Sludge Drying Beds............. Out of the treated effluent, 57 KLD of treated water will be recirculated for flushing and other purposes through a dual plumbing system and 223 KLD will be discharged into the MC sewer. The PP has submitted NOC from Municipal Corporation, Abohar vide no. 3795 dated 06.10.2025 for discharge of treated domestic effluent into the MC sewer. ............. Moreover, the estimated total Solid Waste Generation from the Project will be 1248 kg/d which will be segregated at the source as bio-degradable and non-bio-biodegradable waste as per the SWM rules. The PP has also proposed in-situ remediation of the bio-degradable waste generated from the colony and the non-biodegradable will be handed over to MC Authorities.............. 5. The project proponent has submitted revenue records (Jamabandi) of the project site.............. 6. The project proponent has also submitted a Partnership Deed indicating that the firm consists of 05 no. partners. PP has submitted an authority letter in which Smt Ashima (one of the partners) is granted full authority to do all the acts, deeds and things on the behalf of PP............... The proposed site of the project was visited by the AEE Harblisterjeet Singh on 19.01.2026 and the following observations were made: 1. The project site is located near Ganganagar road, Area Village Alamgarh, Tehsil Abohar, Distt. Fazilka falling within the jurisdiction of Municipal Corporation, Abohar. .................... 2. There is no MAH unit within 250 meters of the project boundary. Additionally, no air-polluting industry exists within a 100-meter radius of the site. Similarly, there are no rice shellers or stone crushers within 500 meters and no cement plants, hot mix plants, or brick kilns fall within 300 meters of the project area................ In view of the above, if approved, it is recommended that Consent to Establish (NOC) may be granted to the project proponent under the provisions of the Water (Prevention & Control of Pollution) Act, 1974 and the Air (Prevention & Control of Pollution) Act, 1981, for the establishment of a colony “Sun City” bearing Khasra Nos. 2//19/2, 20/3, 21, 22, 13//1, 2, 9, 10, 11, 12 situated at Ganganagar road, Area Village Alamgarh, Tehsil Abohar, Distt. Fazilka, comprising 143 plots (130 residential plots and 13 EWS plots) subject to the following conditions: 1. The project proponent shall install the STP as per the proposal prior to commissioning of the project.............. 2. The project proponent shall provide flow meters at the source of fresh water supply, recirculation section, and at the inlet and outlet of the STP, and shall maintain daily records of fresh water consumption and treated effluent utilization................... 3. The project proponent shall develop plantation over an area of 0.33 acres within the project premises for the disposal and utilization of treated wastewater, as proposed, before the commissioning of the project.............. 4. In case any of the documents submitted by the project proponent are found to be forged or incorrect, the Consent to Establish shall be deemed cancelled, and the Board shall not be responsible for any cost incurred by the project proponent in this regard........... 5. The project proponent shall ensure that the total built-up area (FAR basis) of the project remains below 1,50,000 sq. m. In case the built-up area exceeds 1,50,000 sq. m or the built-up area of any individual plot exceeds 20,000 sq. m, the project proponent shall be required to obtain Environmental Clearance as per the provisions of the EIA Notification dated 14.09.2006........... 6. The project proponent shall not use fresh water for the green areas or plantation within the project premises. Adequate arrangements shall be made for reuse of treated effluent for flushing through a dual plumbing system and/or for watering green areas. Any surplus treated effluent shall be disposed of into the MC sewer in an environmentally sound manner................. 7. The project proponent shall ensure that the municipal solid waste generated from the colony is handled in an environmentally sound manner. The biodegradable fraction of the waste shall be treated in-house in compliance with the provisions of the Solid Waste Management Rules, 2016............... 8. The project proponent shall develop vermicomposting or composting facilities to manage biodegradable solid waste and shall not throw, burn, or bury any solid waste in the open, outside the premises, or in any drain/water body................. 9. The project proponent shall ensure strict prohibition on the use of single-use plastics and thermocol disposable items such as water bottles, pouches, cups, plates, forks, spoons, straws, and decorative materials made of plastic or thermocol, or any other non-biodegradable material, within the project premises............... 10. This Consent to Establish is issued from a pollution control perspective only. The project proponent shall obtain all other statutory clearances and permissions from the concerned departments as required under applicable laws..............Note: Agenda could not be generated due to a server error, however, inspection report has been attached herewith. …….
Competency: Senior Environmental Engineer |