Show ApplicationProcessingDetails

Id: 31008651
Approve: false
Approve Note:
Clarification: false
Clarification Note: Respected Mam/Sir Reply to the queries: 1. Since M/s Vividha Infrastructure Private Limited is a private limited company and Mr. Rajesh Sharma is only an authorised signatory, therefore the applicant's name is "Vividha Infrastructure Private Limited." Therefore, a clerical error that occurred in the earlier application was corrected. 2. Yes, the fresh groundwater requirement for the project is 429 KLD only; however, the remaining 613 kl water requirement for the purposes of flushing, irrigation of green area, etc, will be fulfilled from the treated STP wastewater of the project. Presently, only a small portion of the overall water requirement is needed for the project's operational running. Thanks.
Date Created: 2026-01-27 11:54:36.655
File Note: Respected Mam/Sir Reply to the queries: 1. Since M/s Vividha Infrastructure Private Limited is a private limited company and Mr. Rajesh Sharma is only an authorised signatory, therefore the applicant's name is "Vividha Infrastructure Private Limited." Therefore, a clerical error that occurred in the earlier application was corrected. 2. Yes, the fresh groundwater requirement for the project is 429 KLD only; however, the remaining 613 kl water requirement for the purposes of flushing, irrigation of green area, etc, will be fulfilled from the treated STP wastewater of the project. Presently, only a small portion of the overall water requirement is needed for the project's operational running. Thanks.
Inspection: false
Inspection Note:
Officer: R19PTA949364
Reject: false
Reject Note:
Role: Industry