Show ApplicationProcessingDetails

Id: 31338486
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2026-02-27 18:40:43.078
File Note: Subject: Application for obtaining ‘consent to establish/(NOC) under the Water Act, 1974 and Air Act, 1981–M/s Prime Forge, Khata No 100/191, Khasra No 133, Khatauni No 191, Village Kumbh, Tehsil Amloh, Mandi Gobindgarh, Fatehgarh Sahib. Ref: Industry's Application ID 31251202 dated 24.02.2026. A GENERAL INFORMATION (i) Date of first receipt of application. 24.02.2026 Date of receipt of application complete in all respect. 24.02.2026 (ii) Name & Address of the Industry M/s Prime Forge, Khata No 100/191, Khasra No 133, Khatauni No 191, Village Kumbh, Tehsil Amloh, Mandi Gobindgarh, Fatehgarh Sahib. (iii) Raw Materials/Chemicals to be used with quantity Steel Ingot @16 MTD (iv) Products / By Products to Be manufactured with quantity Steel Forgings @ 14 MTD (v) Manufacturing Process (flow chart) (Please write the manufacturing process clearly and do not write that the flow chart is attached) Raw Material > Heating in box type reverberatory furnace> Forgings > Final Product (vi) • Total cost of the project • Cost of plant & machinery. • Rs. 889.38 Lacs • Rs. 450.00 Lacs. As per project report submitted by the industry. (vii) NOC fee Rs. 18,000/- vide online receipt no. 736617703 dated 20.02.2026. Yes, for one year as per circular dated 29/10/2018 • Detail • Whether adequate or not? If yes, for how many years the same is adequate. (viii) Category of the Industry (Red/Orange /Green) ORANGE / 102.2 Forging of ferrous and non - ferrous metals using gaseous fuel (ix) Scale of the industry and the detail of certificate issued by the Competent Authority regarding Scale of the industry (Small / Medium / Large) Small (x) Likely date of commissioning September, 2026 (xii) Land area for which CLU has been obtained from the Competent Authority of the State, in case applicable NA (xiv) Proposed source of water supply Own Tubewell (Submersible Pump) (xv) Competent Authority to decide the case and the circular no. & date vide which the Board has delegated powers to decide the application. Senior Environmental Engineer B Coverage of industry under EIA notification dated 14/9/2006 First Schedule of Factories Act, 1948/ Press Note 17 (1984 Series) (i) Whether the industry is covered under First Schedule of Factories Act, 1948or N/A not? If yes, status of clearance of site from Site Appraisal Committee. (ii) Whether the industry is covered under EIA notification dated 14/9/06 or not? If yes, status of the environmental clearance. No (iii) Whether the industry is covered under Press Note 17 (1984 series) or not? If yes, status of environmental clearance from the State Competent Authority. No C Location status and siting guidelines i) Whether industry specific siting guidelines are applicable or general siting criteria is applicable? General sitting guidelines are applicable ii) No. & dated of the notification /circular /officer order of the siting criteria applicable to the industry April, 2013 v) Comments of the visiting officer about the suitability of site and construction status: As per details given below D Source of Water Pollution and its Control (i) Trade Effluent Quantity : N. A (ii) Domestic Effluent Quantity: 0.3 KLD Mode of disposal: Onto land for Plantation passing through septic tank. (iii) In case mode of the disposal is onto land for irrigation / plantation, give details of land availability and its adequacy. Land availability: Available Whether adequate or not: yes (iv) Details of Recirculation System Process water : N.A recirculated E Source of Air Pollution and its Control (i) Sourcesof Fuel / Process Emissions Steam Gen./ capaci ty Type & Qty. of fuel Stack height (proposed) APCD(proposed) Above GL. Above RL. Adequa cy Type Adequ acy Box Type heating furnaces and 2 no. Hammer of capacity 3.0 Ton & 2.0 Ton 16 MTD PNG@ 15000 22 12 Not Required Not Require d --- (ii) Whether the air pollution arrangements proposed by the industry are adequate or not? Adequate in principle (iii) Whether the boiler furnace will be based on FBC system or not? N.A (iv) Whether proper canopy has been to install with the D.G. set? ---- F Detail of hazardous wastes to be generated, which are covered under the Hazardous& Other Wastes (Management & Transboundary Movement) Rules, 2016 Source of hazardou Quantity to be Category as per Storage / disposal s wastes generated Schedule arrangement s ---- G Detail of solid wastes (other than hazardous wastes) to be generated and the sources there of? Which environmentally sound measures will be taken for storage and disposal of the same? Source of Solid wastes Qty.to be generat ed Storage/ Disposal arrangements --- ---- ---- H Whether the industry has submitted all documents required for the grant of NOC? (details of documents to be mentioned) yes. It is submitted that the industry is a Small-scale unit and has applied for obtaining Consent to Establish (NOC) under the provisions of the Water Act, 1974 and the Air Act, 1981 for sent up a new unit for manufacturing of Steel Forgings @ 14 MTD by using raw material as Steel Ingot @16 MTD. Project Report: The industry has also submitted the brief project report, wherein, it has mentioned that the total project cost for the proposed Project is Rs. 889.38 lakhs with value of plant & machinery are Rs. 450.00 lakh. Accordingly, the industry has deposited NOC fee of Rs. Rs. 18,000/- vide online receipt no. 736617703 dated 20.02.2026, which is valid for 01 year as per circular dated 29/10/2018. Manufacturing Process: The industry has submitted the manufacturing process, which is as under: Raw Material > Heating in reverberatory furnace> Forgings > Final Product. Site Suitability: The industry has submitted principal approval letter vide certificate No. 2601152212 dated 17.02.2026 regarding the site of the industry located at revenue of Village Kumbh, Tehsil Amloh, Mandi Gobindgarh, Fatehgarh Sahib and the site falls under industrial land use zone as per notified master plan of Mandi Gobindgarh. The site of the industry is suitable for the proposed project. Applicability of EIA notification dated 14/09/2006 The subject cited industry is not covered under EIA notification 2006 Notification dated 14.09.2006. PWRDA Permission The industry has mentioned the ground water extraction @ 0.4 KLD however, the same needs to be as per the consumption. Considering 30 working days in a month, the ground water extraction will be 12 KL/month. As such, the industry does not require to obtain permission for abstraction of ground water from PWRDA. Visit: To verify the contents of application the industry was visited by Officers of this Office on 25.02.2026. During visit, it was observed as under: 1. The proposed site of the industry falls in the revenue estate of Village Kumbh, Tehsil Amloh, Mandi Gobindgarh, Fatehgarh Sahib. 2. The proposed site for the industry is presently a vacant plot of land, having brick boundary wall approximately 7 feet Hight. 3. No water will be used in the process; hence no trade effluent will be generated. 4. Domestic effluent is being discharged on to land for plantation after passing through septic tank. 5. The industry has proposed to install Box Type heating furnaces@16 MTD and 2 no. Hammer of capacity 3.0 Ton & 2.0 Ton using PNG as fuel. Recommendation In view of the facts mentioned above, if approved, it is recommended Consent to Establish (NOC) under the provisions of the Water (Prevention & Control of Pollution) Act, 1974 and the Air (Prevention & Control of Pollution) Act, 1981 for manufacturing Steel Forgings @ 14 MTD by using raw material as Steel Ingot @16 MTD, may be granted to the industry for one year with suitable conditions. Competency: Senior Environmental Engineer
Inspection: false
Inspection Note:
Officer: PPCB118
Reject: false
Reject Note:
Role: RO AEE Malkit Singh