| File Note: |
In view of the above, it is recommended as under:…………. 1. CTO under the Water Act, 1974 and the Air Act, 1981 may be granted to the industry at its new location of D-321, Phase-8, Ludhiana, for production of dyeing & finishing for all type of fabrics (Polyester, PC & Cotton) @ 15250 Kgs/day & Dyeing of Yarn @ 6000 Kg/day with proposed discharge of trade effluent @ 648 KLD, into 40 MLD CETP Module (for which it was last granted NOC ), for a period of 03 months, subject to the suitable conditions and specific as under :………….. a. The industry shall only use adequate machinery for production of dyeing & finishing for all type of fabrics (Polyester, PC & Cotton) @ 15250 Kgs/day & Dyeing of Yarn @ 6000 Kg/day with proposed discharge of trade effluent @ 648 KLD, into 40 MLD CETP Module (for which it was last granted NOC )………… b. The industry shall be bound to follow any Hon'ble NGT directives related to dyeing industries in ongoing litigations and the grant of NOC from the Board shall not abstain the industry from following such directives. …………. c. The Punjab Pollution Control Board shall not be responsible for any loss incurred to the industry in case the industry fails to submit the balance share certificate from the PDA……………. d. If the industry fails to achieve the desired standards at its outlet before the CETP, then it shall install adequate pre-treatment arrangements to bring its standards with the prescribed limits or limits as may be decided by the Board. …………… e. The industry keeps its trade effluent generation within the allotted share capacity and shall install and operate dyeing machinery of equivalent capacity and keeps check on its TDS levels as per CETP inlet design parameters through use salt free chemicals……………. f. The industry shall not generate/discharge trade & domestic effluent more than its allotted shares capacity at any stage. …………… g. The industry shall discharge the whole of its consented effluent into a dedicated sewer line leading to CETP for final treatment…………. h. The industry shall not make any new connection/undisclosed connection for the discharge of effluent either into the public sewer or PDA conveyor system……………. i. The industry should either take measures to control its inlet parameters by good practices and selection of good chemicals for processing or shall operate and maintain its existing effluent treatment plant (ETP), regularly and efficiently, so as to achieve the inlet effluent standards of CETP as per DPR. ……………… j. The industry shall make the necessary arrangements to achieve the effluent standards as per the inlet-designed parameters of the CETP…………………… k. There shall be no any other physical expansion of the unit either with the installation of new machinery without valid permissions of the Board………………. l. The industry shall stop discharging its effluent in case due to any reason the CETP is not operational or the dedicated conveyance system is overflowing. ………………… m. The industry shall maintain the record of flow meter installed at source and at the outlet leading to CETP. …………….. n. The industry shall carry out third-party audit from any reputed institute to access the actual discharge capacity of the dyeing unit in compliance with the proceedings issued by the Board vide letter no. 4387 dated 09.08.2023 to the CETP 40 MLD. …………………. o. The industry shall obtain permission for the use/abstraction of groundwater as per the requirements from Punjab Water Regulation & Development Authority (PWRDA)……………..
2 ) Direction u/s 33 A under the Water Act 1974 may be issued that machinery in excess installed by the industry from 648 KLD discharge of effluent into 40 MLD CETP Module, shall be sealed by the Regional Office of the Board within 02 days.
3 ) Direction u/s 33 A under the Water Act 1974 may be issued that if any wet process machinery is installed/placed in the premises industry at its previous location at Kuldeep Nagar, Near Basti Jodhewal, be sealed by the Regional Office 4 immediately.
Submitted for approval ,please |