| File Note: |
The above note may kindly be perused…………….
May if approved:
1. Consent to operate under Water (Prevention & Control of Pollution) Act, 1974 may be granted for six months for PC dyeing @ 2700 Kgs/day Or Polyester Dyeing @ 10800 Kgs/day with discharge of trade & domestic effluent @ 150 KLD into conveyance system of CETP 50 MLD with suitable condition and addition condition that:-
I. The industry shall make the necessary arrangements to achieve the effluent standards as per the inlet designed parameters of the CETP.
II. The industry shall stop discharging its effluent in case due to any reason the CETP is not operational or dedicated conveyance system is overflowing.
III. The industry shall maintain the record of flow meter installed at outlet leading to CETP.
IV. The industry shall not generate/discharge trade & domestic effluent more than 80 KLD without obtaining prior permission of the Board.
2. Directions u/s 33-A of the Water Act, 1974 be issued to the PSPCL Authorities for restoration of the electricity connection of the industry for six months.
Competency: SEE, Ludhiana(consent case)
CEE, Ludhiana(Restoration)
|