Show ApplicationProcessingDetails

Id: 31502414
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2026-03-18 13:52:33.147
File Note: The point-wise clarification is submitted as under: 1. Regarding revocation of CTO dated 09.04.2025: It is submitted that CTO was revoked as the unit was found operating without valid mining registration, which was cancelled by the Mining Department. The same was in violation of consent conditions. (CTO revocation copy attached herewith). It is further clarified that earlier directions under Section 33-A of the Water (Prevention & Control of Pollution) Act, 1974 and Section 31-A of the Air (Prevention & Control of Pollution) Act, 1981 were issued for electric disconnection vide PPCB, Zonal Office, Jalandhar letter no. 2515 dated 24.08.2022 (copy attached)due to operation without legal source of raw material, Further, it was restored temporarily for short period of six months ie upto18.06.2023 vide PPCB, Zonal Office, Jalandhar letter no. 4089 dated 19.12.2022. 2. Status of mining registration: The unit has now submitted valid mining registration upto 31.12.2026, issued by the Mining Department. Hence, the primary reason for earlier revocation stands rectified. 3. Whether consent can be granted without mining registration: It is submitted that as per the policy of the Board, submission of mining registration is not a mandatory requirement. However, the Board requires a confirmation from the Mining Department regarding availability of legal source of raw material. 4. Availability of legal source of raw material: The unit has submitted certificate from Mining Department (Letter No. 645/4 MW dated 19.02.2026) confirming availability of raw material from legal sources. 5. Regarding plantation deficiency: Partial green belt has been developed. However, additional plantation is required along the boundary, which can be ensured through specific condition in CTO within stipulated time. It is further submitted that the unit has already planted additional saplings within the premises, and photographs of the plantation are attached herewith. 6. Compliance of Code of Practice (CoP): As per inspection dated 22.01.2026, the unit was found complying with pollution control measures such as covering of crushers and conveyor belts, water sprinkling system, stabilized roads and dust suppression arrangements. Hence, substantial compliance of CoP is observed, subject to improvement in plantation. 7. Pending enquiry status: As per record, no enquiry/investigation is pending against the unit at present. In view of restoration of valid mining registration, availability of legal source of raw material and compliance of pollution control measures, it is recommended that: 1. Short Term Consent to Operate under Water Act, 1974 & Air Act, 1981 for a period of six months may be granted to the unit with condition to complete green belt development. 2. Directions to PSPCL for temporary restoration of electric connection may be issued for the said period.
Inspection: false
Inspection Note:
Officer: PPCB194
Reject: false
Reject Note:
Role: RO AEE Tarundeep Singh