Id: 31633464
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2026-04-01 14:11:16.036
File Note: It is submitted that the RO has submitted compliance report of the conditions imposed in the CTOs earlier granted to the project in annotated form. In consideration of the report/ recommendations of RO; if approved, the competent authority be recommended that the consent to operate granted under the provision of the Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 may be granted to the project upto 30.09.2027, subject to general and additional conditions that: 1. The project proponent shall ensure to operate the STP of capacity of 350 KLD for the said project. 2. The project proponent will add mechanical composters as per requirement in addition to 300 kg installed at site as and when the production of waste exceeds processing. 3. The industry shall complete the pending work related to installation of DG sets and plumbing of Block B and shall submit the report to the Board within one month. 4. The project shall utilize only treated wastewater in green area within its premises. 5. The project shall not start the construction of the group housing in the area, which has been already earmarked for provision of plantation of area as per Karnal Technology without providing alternate disposal arrangement. 6. The project proponent shall reuse treated wastewater for flushing purpose by providing dual plumbing system in the project and shall use only treated wastewater for the said purpose. The project proponent shall impose a condition in this regard in all the allotment letters/registries to be done in the project. 7. The project proponent shall not carry out construction activity by its self and shall only sell plots to respective owners. 8. The project proponent shall comply with the guidelines issued by PWRDA and shall obtain permission from PWRDA for abstraction of ground water. 9. The project proponent shall not allow any occupancy at its project, without obtaining prior ‘consent to operate’ under the Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981. 10. The project proponent shall be granted ‘consent to operate’ under the Water (Prevention & Control of Pollution) Act, 1974, only after accessing the arrangements for disposal of treated effluent at that point of time. PPCB shall not be responsible for any loss (including financial) to the project proponent in this regard, howsoever. 11. The project proponent shall provide separate water meter and energy meter for the STP and maintain record of the same on daily basis. 12. The project proponent shall submit the complete drawing and design of the STP and its component at the time of obtaining consent to operate. 13. The project proponent shall place adequate no. of bins outside its premises from where the Municipal Solid Waste shall be got lifted. 14. The project proponent shall also ensure that the hazardous waste and e-waste components of the solid waste shall also be segregated and the same shall be channelized to the authorized facility for such type of waste. 15. The project proponent shall comply with the provisions of the Construction and Demolition Management Rules, 2016. 16. The project proponent shall take adequate steps to the effect that the construction material of any kind that is stored at site shall be fully covered in all respects so that it does not disperse in the air in any form. 17. The project proponent shall ensure that all the construction material and debris shall be carried out in trucks or other vehicles which are fully covered and protected so as to ensure that the construction debris or the construction material does not get disburse into the air or atmosphere in any form. 18. The project proponent shall take all necessary steps to control the dust emissions to be generated from the construction activities of the project. 19. The project proponent shall ensure that the vehicles carrying construction material and construction debris of any kind shall be cleaned before it is permitted to ply on the road after unloading of such material. 20. The project proponent shall provide mask to every worker working on the construction site and involved in loading/ unloading and carrying of construction material and construction debris. 21. The project proponent shall provide all medical help, investigation and treatment of workers involved in construction of building and carrying out construction material and debris related to dust emissions. 22. The project proponent has been approved by the Board from pollution angle and the industry shall obtain the statutory clearances / permissions from all other concerned departments. 23. The adequacy/ efficacy of the pollution control arrangements and disposal arrangements shall be the sole responsibility of the industry and the industry shall be bound to implement/ upgrade its pollution control arrangements as per the discretion of the Board to achieve the prescribed emission/ effluent standards, as amended from time to time. 24. The project proponent shall ensure the compliance of provisions of the Water (Prevention & Control of Pollution) Act, 1974, Air (Prevention & Control of Pollution) Act, 1981, Environment (Protection) Act, 1986 and/or any other environmental law applicable to him and Rules, Circulars & Directions issued by the Board from time to time. 25. The NOC is being issued to the project proponent based upon the documents/ information submitted by it alongwith the online application form. The Board would be at liberty to take penal action against the industry/project proponent and its responsible/ concerned person(s) in case information/document is detected as incorrect/false/misleading at any point of time, without any opportunity of Personal Hearing. 26. In case the project proponent fails to comply with the provisions of the Water (Prevention & Control of Pollution) Act, 1974, Air (Prevention & Control of Pollution) Act, 1981, Environment (Protection) Act, 1986 and/or any other environmental law applicable to the project and Rules, Circulars & Directions issued by the Board from time to time, action as deemed fit shall be taken against the project proponent. Comp.: Worthy Chairperson of the Board (Building and construction project more than 50 cr.)
Inspection: false
Inspection Note:
Officer: PPCB130
Reject: false
Reject Note:
Role: ZO EE Mohit Bisht