Show ApplicationProcessingDetails

Id: 31642316
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2026-04-02 11:07:18.906
File Note: Kindly peruse the note of EE,ZO. On perusal of the said reply, it is submitted that 1. The industry has installed 3 no. DG sets of capacity 500 KVA, 500 KVA and 750 KVA. However, the installed stack heights are 12 metre each against the required height of 10.47 metre (for 500 KVA) and 11.47 metre (for 750 KVA) calculated by using the prescribed formula along with portholes and also having adequate sampling arrangements (photos attached).The industry has provided the adequate stack height of DG sets. 2. The industry has installed 3 no.’s boiler of capacity 300 kg, 600 kg and 600 kg having adequate stack heights of 12 metre each along with the portholes (Photographs attached). The boiler stacks extended through the wider roof. however, sampling can be performed easily from the rooftop (Photographs attached). 3. The details of sampling carried out by the private lab is attached. In view of the facts mentioned above, it is recommended that Consent to Operate under the Air (Prevention and Control of Pollution) Act, 1981 may be granted for the period up to 30.09.2028, as earlier recommended, subject to general terms and conditions of the Board. Competency lies with the Chief Environmental Engineer being a Large Orange category unit
Inspection: false
Inspection Note:
Officer: PPCB071
Reject: false
Reject Note:
Role: ZO SEE Vijay Kumar