Show ApplicationProcessingDetails

Id: 5246268
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2017-03-03 12:37:31.509
File Note: Vide PUC, the subject cited industry has applied for obtaining further extension in validity of consent to operate under Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 under green category. Earlier consent to operate under Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 were extended upto 28/01/2015 & 29/07/2017 vide this office letter no. 4544 & 4546 dated 06/06/2011 respectively under Green Category. It is further intimated that the industry has deposited Rs. 7500/- each vide R.No. 10/4690 & 11/4690 dated 28/07/2015 & Rs. 1500/- each R.No. 23/4450 & 24/4450 dated 20/02/2017 as consent to operate under Air (Prevention & Control of Pollution) Act, 1981 and Water (Prevention & Control of Pollution) Act, 1974 respectively against gross value of fixed assets of the industry worth Rs. 9,95,375/- as on 31/03/2016 and same are adequate upto 30/06/2027 under both Acts. The industry was visited by undersigned on 27/02/2017 and observed as under:- 1. The industry is engaged in a process of manufacturing of briquettes from agricultural waste. 2. During visit the industry was in operation. 3. The industry has provided cyclone as APCD to contain dust emission. 4. There is no source of trade effluent. If approved:- “Consent to operate under Air (Prevention & Control of Pollution) Act, 1981 may be granted upto 31/12/2025 for the manufacturing of fuel briquettes @ 5 TPD subject to the following special conditions:- 1. The industry shall not generate any trade effluent. 2. The industry shall not enhance the production capacity of the unit without prior permission of the Board. 3. The industry shall provide rain water harvesting system in its premises to carry roof top rain water into underground strata within 06 month period from the date of issue of this consent. 4. No surface run off or any other rain water flowing in lawns/ garden be allowed to enter into the rain water harvesting system. 5. All the pipes provided for the recharging system should be visible and properly coloured with light blue colour.
Inspection: false
Inspection Note:
Officer: PPCB069
Reject: false
Reject Note:
Role: RO AEE Sukhdev Singh