Show ApplicationProcessingDetails

Id: 5612105
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2017-05-19 13:40:41.195
File Note: The industry is a saila plant engaged in a process of manufacturing of parboiled rice and earlier consent was granted upto 31/03/2017. The Regional Office after visiting the industry on 02.05.17 and reported that the industry has installed one no. boiler of steam generating capacity 12 TPH, in which rice husk as fuel is used and the industry has provided trima cyclone as APCD, however during stack monitoring samples collected on 01/01/2016 the APCD in the data sheet was mentioned as multi-cyclone by erroneously. The industry has installed 2 nos. shelling sections and 2 nos. drier sections and cyclones as APCD are provided separately with these sections. The industry has installed 3 nos. D.G. sets (1x 600KVA, 1x320KVA & 1x725KVA) & all of them are provided with canopy. The industry has provided enclosed room for the storage of rice husk.The industry has provided elevator for carrying rice husk into boiler furnace.The industry has provided enclosed conveyor belt for carrying ash at ash storage yard. The industry has also provided water sprinkling system. Further stack emission samples were collected by Board on 10/11/2016 and as per analysis, the parameters are found within the prescribed limits of the Board and industry did not manufacture parboiled rice during entire season, therefore the trade effluent sample could not be collected. Further reported that the industry is complying with the conditions of consent to operate granted earlier as well as code of practice framed for rice shellers/saila plants .Keeping in view of the report as detailed above , it is proposed that consent may be granted up to 31.3.2018 with usual conditions . Submitted for approval, please.
Inspection: false
Inspection Note:
Officer: PPCB030
Reject: false
Reject Note:
Role: ZO SEE Kulwant Singh