| File Note: |
Discussed with Worthy SEE(ZO) by your goodself with me on 21.06.2024. The desired details are as under:-
Hazardous Waste Generation and Hazardous Waste lifted to CTSDF for the period April, 2023 to March, 2024 are as under:-
(a) The treated Trade Effluent discharged = 1,17,316 KL
(b) Generation of Hazardous Waste = 1,28,865 Kg
(c) Hazardous Waste Lifted to CTSDF = 1,23,630 Kgs.
(d) As per treated trade effluent discharged the Hazardous was required= 1.5 Kg/KL x 1,17,316 KL=1,75,974 Kg.
(e) As per record maintained, the Hazardous Waste Generated = 1,28,865 KL /117,316 KL = 1.09844 Kg/KL
From the above, as per case study 1.5 Kg/KL of Hazardous Waste generation was required, but as per industry record the Hazardous Waste generation remained 1.09 Kg/KL which found lower side as compare to case study.
Submitted for kind information and perusal of Competent Authority of the Board, please.
|