ApplicationProcessingDetails List

Id Approve Approve Note Clarification Clarification Note Date Created
12179040 false false 2020-02-05 16:28:13.12
20667491 false false 2022-12-16 23:37:57.552
20777657 false false 2023-01-02 12:40:58.965
20777682 false false 2023-01-02 12:42:09.592
20777775 true Granted false 2023-01-02 12:46:14.583
20881643 false false 2023-01-13 15:51:06.003
20881647 false false 2023-01-13 15:51:32.298
20881655 false true Under Environment surveillance campaign, the industry was visited surprisingly on 02.12.2022 by undersigned and observed as under: 1. The industry was in operation during visit. 2. It has 2 no. cold rolling mills, pickling plant, shot blast machine and ERW pipe plant. 3. The industry has obtained consent to operate for manufacturing of CR strips @ 8 TPD and ERW pipes @ 5 TPD. However, actual production (average) disclosed by industry is CR strips @ 12 TPD and ERW pipes @ 18 TPD. Therefore, it is required to obtain varied consents. 4. The housekeeping of industry in the pickling section and recirculation of cutting oil section is very bad due to lot of spillages of acid and it needs to be improved. 5. The industry has provided inlet water meter in the picking section and reading of same was 214.02 KL. 6. As per record maintained by industry, it has used fresh water @ (214.02 - 209.815) KL = 4.205 KL w.e.f. 01.06.2022 and lifting to CETP in said period are as under: 17.11.2022 – 6000 ltr 18.10.2022 – 6000 ltr 19.09.2022 – 5000 ltr 27.07.2022 – 5000 ltr 24.06.2022 – 5000 ltr Total – 27000 ltr 7. As per record maintained by industry, it has noted reading of water meter as 232.155 on 30.11.2022 and actual reading noted during visit is 214.02 KL. So, it is clear that the industry is manipulating all the record. 8. It has storage tank of capacity 10 KL for collection of trade effluent. 9. During visit, it has stored approx 4 KL waste water in collection tank. 10. The industry has not provided any environmental data board. Please submit compliance report. 2023-01-13 15:52:09.641
20881662 false false 2023-01-13 15:52:23.736
21107587 false true The industry has submitted the compliance of special condition imposed in previous consent as under:- The industry shall not operate its plant till the industry comply with all the in-completions as reported in the notice issued and shall submit compliance report to the Board before restarting the operation of industry. as well as compliance of proceeding of the personal hearing dt 21.06.2022 issued to the ethanol plant. Please reply within 02 days. 2023-02-08 16:25:02.867
Previous1..187903187904187905187906187907187908187909187910187911187912..203649Next