ApplicationProcessingDetails List

Id Approve Approve Note Clarification Clarification Note Date Created
31377496 false false 2026-03-05 09:57:27.367
31377500 false false 2026-03-05 09:58:09.461
31377606 false true The application was scrutinized and the following observations have been made: 1. The project proponent has not submitted the Certificate/NOC from the Department of Town & Country Planning regarding the land use classification of the new land area measuring 5.12 acres, for which they have applied for CTE (Expansion). Instead, they have submitted an old NOC pertaining to an area of 11 acres, for which CTE had been granted earlier. 2. As per the site plan submitted, the total green area is shown as 2600 sq. yards. However, as per the project report, the discharge of treated wastewater onto land for plantation is mentioned for an area of 2600 sq. yards, while another green area of 1337 sq. meters has also been indicated. It is not clear where this additional green area of 1337 sq. meters is located, as the same is not reflected in the site plan. 3. In order to assess the adequacy of the proposed sewage treatment and wastewater management arrangements for the project, the following clarifications may kindly be provided by the project proponent: (a) Maximum Built-up Area of the Project: It is requested to clarify the maximum permissible built-up area for the project. It is observed that the present sewage calculations appear to be based on the existing ground floor built-up area of 10 Acres. However, if first floor or second floor construction is permissible over the industrial/commercial plots, the total built-up area and corresponding population may increase significantly, which may consequently increase the water demand and sewage generation load on the proposed STP. Accordingly, the maximum potential built-up area may be specified and the adequacy of the proposed 50 KLD STP may be justified as per the norms of NBC and CPHEEO. 2026-03-05 10:06:07.312
31377905 false false 2026-03-05 10:23:41.001
31507655 false false 2026-03-18 17:45:31.386
31507675 false false 2026-03-18 17:45:46.58
31632924 false true On scrutinizing the application of the project proponent it was observed as under: 1. The project proponent has not submitted permission from PWRDA for abstraction of 3204 KLD of fresh water. 2. The project is covered under EIA Notification dated 14.09.2006 and needs to submit the point wise compliance of the Environmental Clearance granted by the Competent Authority, details of AEA activities carried out alongwith authenticated proof of the expenditures. 3. The project proponent needs to earmark the green area on the layout plan. You are therefore requested to submit reply of the above said observation within 2 days 2026-04-01 13:30:52.935
31736754 false false 2026-04-13 14:55:03.415
30847455 false false Respected sir, it is informed that the above unit is an existing and we are complying all the SOPs and there is no requirement of distance certificate being an existing unit. Further, request letter regarding the same is attached with the application form. It is requested to consider the above reply and grant us permission of the PPCB. 2026-01-06 20:13:30.912
30864307 false false 2026-01-08 13:03:17.774
Previous1..938939940941942943944945946947..201478Next