ApplicationProcessingDetails List

Id Approve Approve Note Clarification Clarification Note Date Created
25862240 false true The application of the industry was scrutinize and following incompletion/shortcoming were observed:- 1. Compliance of the earlier granted consent conditions has not been submitted. 2. Water balance showing fresh water consumption, re-use after RO and RO reject fed to evaporator has not been provided. 3. No details of flow measuring device provided on evaporator has been given, so as to record steam fed to evaporator for achieving ZLD. 4. The report of the expert committee dated 02.02.2024 reveals that the real time/actual capacity of the evaporator installed by the industry was checked during the visit by making the evaporator operational and it was only made possible after diverting entire steam from boiler to the evaporator. Further practically the evaporator was able to evaporate 300 ltr of RO reject in 1 hr 30 min. However, in the feasibility report the capacity of evaporator has been mentioned 1000 ltr/hr. The committee has further recommended installation of additional dedicated boiler for evaporation of RO reject. The industry needs to provide calculations justifying the installed capacity of the evaporator as 1000 ltr/hr along with steam requirement calculations (operating pressure), as the boiler installed by the industry is a baby boiler. You are requested to clarify so as to proceed further in the matter. 2024-06-06 15:15:21.448
25862250 false false 2024-06-06 15:15:59.304
26251174 false false 2024-07-16 14:28:03.097
24971905 false false 2024-02-22 13:51:27.406
25115708 false false 2024-03-09 22:16:12.534
25233273 false false 2024-03-22 13:36:50.339
25346816 false false 2024-04-04 15:17:54.961
25346910 false false 2024-04-04 15:24:07.686
25443884 false false 2024-04-18 10:53:17.612
25570227 false false 2024-05-02 19:02:35.502
Previous1..197477197478197479197480197481197482197483197484197485197486..201572Next