ApplicationProcessingDetails List

Id Approve Approve Note Clarification Clarification Note Date Created
26384747 false false 2024-07-25 18:58:53.651
26399252 false false 2024-07-27 16:24:29.739
26401480 false false 2024-07-28 11:47:43.464
26403529 false true Earlier the industry has submitted an application as per which the industry was proposing increase in production capacity along with addition in the land area under the rice sheller and since the land proposed to be added was not suitable as per the guidelines as such the proposal was with drawn by the applicant industry............................Now the industry has submitted amended proposal for increase in production capacity without addition in the land area under the rice sheller however has attached site plan showing the addition in the land area...................The industry is required to submit the amended site plan without having any expansion in the land area as well as undertaking stating that no increase in the existing land area will be done for increasing the production capacity of the rice sheller................................Kindly submit the same within 2 days. 2024-07-28 23:58:59.97
26404123 false false 2024-07-29 09:30:50.846
26411387 false false 2024-07-29 15:50:41.718
26411441 false false 2024-07-29 15:53:30.263
26412055 false false Respected Sir, it is submitted that earlier we have applied for consent to operate under the Water Act, 1974 and Air Act, 1981 with compliance of all the norms but the same was restored temporarily for shorter period. We have already complying with all the pollution control norms and already provided necessary arrangements to control the fumes of process emissions. there is no change in the production capacity as well as pollution load as there is no option available for applying renewal of consent. Accordingly, we have applied for VARIEd option through invest punjab with request to restore our electric connection permanently. It is requested to kindly consider our request and restore our electric connection permanently and grant consents for longer period please. 2024-07-29 16:21:55.104
26412409 false false 2024-07-29 16:32:34.268
26412413 false false 2024-07-29 16:32:52.363
Previous1..199440199441199442199443199444199445199446199447199448199449..200505Next